Laserfiche WebLink
T <br /> Monitoring System Certification-Page 2 of 3 <br /> Site Address: 2541 Jackson Ave. <br /> Date of Testing/Servicing: 7131118 <br /> i <br /> D. Results of Testing/Servicing <br /> Software Version Installed. 333.05 <br /> Com tete the folio 'ng checklist: <br /> Yes 10 No Is the audible alarm o erational? <br /> no Yes ❑ No* Is the visual alarm operational? <br /> ® Yes 13 No* Were all sensors visually ins ected,functionally tested,and confirmed operational? <br /> ® Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> Yes ❑ No* if alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem) <br /> ❑ N/A operational? <br /> IN Yes ❑ No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak,fails to operate,or is electrically disconnected? if yes:which sensors initiate <br /> positive shut-down? (Check all that apply) m Sump/Trench Sensors; ❑ Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ® Yes ❑ No <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no <br /> ® N/A mechanical overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tan <br /> Ok <br /> fill point(s)and operating roperly? If so,at what percent of tank capacity does the alarm trigger? <br /> ❑ Yes* ® No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,om <br /> r other equipent replaced <br /> and list the manufacturer name and model for all replacement arts in Section E,below. <br /> ® Yes* ❑ No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑ Product;® Water. If es,describe causes.in Section E,below. <br /> Yes <br /> ii No* Was monitoringsystem set-up reviewed to esure ro er settings? Attach set-u re orts, f a licable. <br /> Yes 1 ❑ No* Is all monitoring equipment operational per manufacturer s specifications? <br /> *71n Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: Replaced TLS Battery for PM Purpose. <br /> Estops-Tested&Passed. <br /> 91 STP Sensor Found Horizontal,Installed Means to Secure Sensor After Testing. <br /> Removed Liquid From 87,91 &Diesel STP Sumps. <br /> Adjusted Floats&Chains in UDC 1 -2 for R/U &Premium. <br /> Premium and Diesel are Split Tanks and Share Annular. <br />