My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
2501
>
2300 - Underground Storage Tank Program
>
PR0231488
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 12:06:22 PM
Creation date
6/23/2020 6:49:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231488
PE
2361
FACILITY_ID
FA0003910
FACILITY_NAME
H&M - BW #98
STREET_NUMBER
2501
STREET_NAME
JACKSON
STREET_TYPE
AVE
City
ESCALON
Zip
95320
CURRENT_STATUS
01
SITE_LOCATION
2501 JACKSON AVE
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231488_2501 JACKSON_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification-Page 3 of 3 <br /> Site Address: 2501 Jackson Ave. Date ofTesting/Servicin& 7/31/18 <br /> F. In-Tank Gauging/SIR Equipment: IM Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com fete the folio inR checklist: <br /> ❑Yes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑HYe s ❑ No* Were all pr I obes reinstalled properly? <br /> E]Yes on the equipment manufacturer's maintenance checklist completed? <br /> In Section H below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): ❑ Check this box if LLD's are not installed. <br /> Com lets the folio ing checklist: <br /> H Yes ❑ No* For equipment start-up or annual equipment certification was a leak simulated verify performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: X 3 g.p.h.(L); ❑ 0.1 g.p.h.(2.); ❑ 0.2 g.p.h.(2.). <br /> Notes: 1. Required for equipment start-up certification and annual certification. <br /> 2. Unless mandated by local agency,certification required only for electronic LLD start-up. <br /> to Yes ❑ No* Were all LLD's confirmed operational and accurate within regulatory requirements? <br /> 0 Yes ❑ No* Was the testing 2p2aratus properly calibrated" <br /> a Yes ❑ No* For mechanical LLD's,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLD's,does the turbine automatically shut off if the LLD detects a leak? <br /> H N/A <br /> ❑ Yes ❑ No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> 19 NIA or disconnected? <br /> ❑ Yes ❑ No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system <br /> 11 N/A malfunctions or fails a test? <br /> O Yes ❑ No* For electronic LLD's,have all accessible wiring connections been visually inspected? <br /> 01 N/A <br /> lil Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In Section H below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments• <br />
The URL can be used to link to this page
Your browser does not support the video tag.