My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1532
>
2300 - Underground Storage Tank Program
>
PR0231522
>
COMPLIANCE INFO_1997-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2024 12:44:18 PM
Creation date
6/23/2020 6:49:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2012
RECORD_ID
PR0231522
PE
2361
FACILITY_ID
FA0004051
FACILITY_NAME
UPS - Stockton
STREET_NUMBER
1532
Direction
N
STREET_NAME
BROADWAY
STREET_TYPE
Ave
City
Stockton
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1532 N Broadway Ave
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231522_1532 N BROADWAY_1997-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB. January 2002 Page 4 of 7 <br /> Site: UPS <br /> 1532 N.Broadway <br /> Stockton,CA 95205 <br /> Date: May 8,2009 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: [ ] Sump Manufacturer [X] Industry Standard [ ]Professional <br /> Engineer <br /> Other(Specie) <br /> Test Method Used: [ ] Pressure [ ]Vacuum [X] Hydrostatic <br /> [ ]Other(S eco ) <br /> Test Equipment Used: CALDWELL LEVEL GAUGE Equipment Resolution: 0.0025 <br /> Diesel#1 <br /> Sump Diameter: 43 inch <br /> Sump Depth: 35 inch <br /> Sump Material: Fiberglass <br /> Height from Tank Top to Top of 11 inch <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 2 inch <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dr <br /> Portion of Sump Tested 12 inch <br /> Does turbine shut down when sump [X]YES [ ]NO [ ]YES [ ]NO [ ]YES[ ]NO [ ]YES[ ]NO <br /> sensor detects liquid(both product& [ ]NA [ ] NA [ ]NA [ ]NA <br /> water)? <br /> Turbine shutdown response time: <br /> Is system programmed for fail-safe [X]YES [ ]NO [] YES[ ]NO []YES[ ]NO [ ]YES[ ]NO <br /> shutdown? [ ]NA []NA [ ]NA [ ]NA <br /> Was fail-safe verified to be [ ]YES[ ]NO [ ]YES[ ]NO []YES[ ]NO [ ]YES[ ]NO <br /> operational? [ INA [ INA [ ]NA [ ]NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting <br /> test: <br /> Test Start Time: 9:15 a.m. <br /> Initial Reading(R1): 12 inch <br /> Test End Time: 9:45 a.m. <br /> Final Reading 12 inch <br /> Test Duration: 30 minutes <br /> Change in Readin Rf-R1 -0- <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: [X]PASS [ ] FAIL [ ] PASS [ ]FAIL [ ] PASS [ ] FAIL [ ]PASS[ ]NO <br /> Was sensor removed for testing? [X]YES [ ]NO [ ]YES [ ]NO [ ]YES [ ]NO [ ]YES [ ]NO <br /> NA NA ]NA NA <br /> Was sensor properly replaced and [X]YES [ ]NO [ ]YES [ ]NO [ ]YES [ ]NO [ ]YES[ ]NO <br /> verified functional after testing? [ ]N/A [ ]N/A [ ]N/A [ INA <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> 1 If the entire depth of the sump is not tested,specify how much was tested. If the answer to gny of the questions indicated with an asterisk(*)is "NO"or <br /> "NA",the entire sump must be tested. (SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.