Laserfiche WebLink
I <br /> SWRCB.January 2002 Page 5 of 7 <br /> Site: UPS <br /> 1532 N.Broadway <br /> Stockton,CA 95205 <br /> Date: May 8,2009 <br /> 7. UNDER-DISPENSER CONTAINMENT UDC TESTING <br /> Test Method Developed By: [ ]UDC Manufacturer [X]Industry Standard [ ]Professional Engineer <br /> [ ]Other(Specify) <br /> Test Method Used: [ ]Pressure [ ]Vacuum [X]Hydrostatic <br /> [ ]Other(Specify) <br /> Test Equipment Used: CALDWELL SYSTEM Equipment Resolution: 0.0025 <br /> UDC# 1 UDC# UDC# UDC# <br /> UDC Manufacturer: Bravo <br /> UDC Material: Steel <br /> UDC Depth: 8 inch <br /> Height from UDC Bottom to <br /> Top of Highest Piping Bottom <br /> Penetration: <br /> Height from UDC Bottom to <br /> Lowest Electrical N/A <br /> Penetration: <br /> Condition of UDC prior to Dry <br /> testing: <br /> Portion of UDC Tested <br /> Does turbine shut down [X]YES[ ]NO [ ]YES[ ]NO [ ]YES[ ]NO [ ]YES[ ]NO <br /> when UDC sensor detects [ JNA [ ]NA [ ]NA [ ]NA <br /> liquid(both product& <br /> water)? <br /> Turbine shutdown response <br /> time: <br /> Is system programmed for [X]YES [ ]NO [ ] YES[]NO [ ]YES[ NO [ ]YES[ ]NO <br /> fail-safe shutdown? NA [ NA NA [ INA <br /> Was fail-safe verified to be [ ]YES[ ]NO [ ]YES[ ]NO [ ]YES[ ]NO [ ]YES[ ]NO <br /> operational? [ ]NA []NA [ NA [ ]NA <br /> Wait time between applying <br /> pressure/vacuum/water& <br /> starting test <br /> Test Start Time: 9:15 a.m. <br /> Initial Reading(RI): 4 inch <br /> Test End Time: 9:45 a.m. i <br /> Final Reading(Rf): 4 inch <br /> Test Duration: 30 minutes <br /> Chane in Reading f-R1 -0- <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: [XI PASS I FAIL I I PASS I I FAIL PASS[ FAIL PASS FAIL <br /> Was sensor removed for [X]YES [ ]NO []YES [ ]NO []YES [ ]NO <br /> testing? N/A N/A N/A <br /> Was sensor properly replaced [X]YES [ ]NO []YES [ ]NO [ ]YES [ ]NO <br /> and verified functional after [ ]N/A []N/A [ ]N/A <br /> test? <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> 1 If the entire depth of the UDC is not tested,specify how much was tested. If the answer to gny of the questions <br /> indicated with an asterisk(*)is "NO"or"NA",the entire sump must be tested. (SWRCB LG-160) <br />