My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1532
>
2300 - Underground Storage Tank Program
>
PR0231522
>
COMPLIANCE INFO_1997-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2024 12:44:18 PM
Creation date
6/23/2020 6:49:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2012
RECORD_ID
PR0231522
PE
2361
FACILITY_ID
FA0004051
FACILITY_NAME
UPS - Stockton
STREET_NUMBER
1532
Direction
N
STREET_NAME
BROADWAY
STREET_TYPE
Ave
City
Stockton
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1532 N Broadway Ave
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231522_1532 N BROADWAY_1997-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB.January 2002 Page 7 of 7 <br /> Site: UPS <br /> 1532 N.Broadway <br /> Stockton,CA 95205 <br /> Date: May 8,2009 <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes [ ] <br /> Spill/Overfill Containment Boxes are Present, but were Not Tested [ ] <br /> Test Method Developed By: [ ]Spill Bucket Manufacturer [X]Industry Standard [ ]Professional Engineer <br /> _ Other(Specify) <br /> Test Method Used: [ ]Pressure [ ]Vacuum [X]Hydrostatic <br /> [ j Other(Specify) <br /> Test Equipment Used: Caldwell Equipment Resolution: 1/32" <br /> O.P.W. S ill Box Spill Box Spill Box <br /> Bucket Diameter: 12 inch <br /> Bucket Depth: 13 inch <br /> Wait time between <br /> applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 9:15 a.m. <br /> Initial Reading(R1): 11-1/2 inch <br /> Test End Time: 10:15 a.m. <br /> Final Reading(Rf): 11-1/2 inch <br /> Test Duration: 1 hour <br /> Change in Reading(Rf-RI) -0- <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: X Pass Fail Pass [ Fail Pass Fail Pass Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.