Laserfiche WebLink
,Oct 16 07 07:18p Sheila Wallace 9 56897921 p.5 <br />is <br />integrity. Patches in exterior wails shall be water and moisture proof. Allpatched areas <br />shall be painted to match existing colors. All other types of interior or exterior walls, that <br />are shall also meet the above-mentioned criteria.. <br />5.11 The Contractor shall furnish VERIZON with five (5) complete copies of all <br />MamWacturers' datalwarranty sheets, photographs, documentation, permits, closure <br />reports and drawings for their records in flat binders. The "As -Built" drawings will be <br />provided by the Contractor as a part of the binder package. <br />5.12 The Contractor shall base their bid on a 6 clay workweek, 10 hours per day. <br />The following materials shall be provided by VERIZON and installed by the Contractor as described <br />herein: <br />6.1 VERIZON will be furnishing the following Pnemnercator equipment: (1 each) IMS <br />2000, Panel W/impact r; (1 each) MP450, Tank Probe; (1 each) LS -610, <br />bftrsfitial Sensor, (1 each) -LDBN, Sump Sensor, (I each) RA -200, Extexior <br />Over -fill Annunciator. <br />7.1 The VERIZON Construction Specification of 4,000 psi shall be anbcable for all <br />concrete work runless otherwise specified on this. <br />S. BUILDEgG PERNIFTS <br />8.1 The Contractor shall be responsible for having all their required hoenses and permits <br />needed to satisfy all governmental agencies having jurisdiction over this project- The <br />Contractor will have full responsibility for the State <br />8.2 The Contractor shall make application for building and construction permits for all <br />phrases of the work. <br />8.3 The Contractor shall pay any permit, plan check or filing fees required for this project. <br />The Conbactor shall monitor the application process, through the review process, and <br />shall respond to any comments or questions concerning the application. <br />8.4 The Contractor shall be responsible for contacting the appropriate governmental agencies <br />and/or departments to schedule the required inspections. <br />'1 Following the completion of work,the Contractor <br />1 removeuaA debris.u1 other <br />materials, contaminated ♦ otherwise <br />. t :. F i the t 1.. - 7....- material I .::sW1.:- disposed <br />of neat, orderly a: r proper manner 1." +., this - and d r .- 1 ✓.. codes. -.,. r :,:: <br />disturbed during consftuction diall be restored to match the original or existing site <br />• s di[t s <br />