My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DE VRIES
>
13850
>
2300 - Underground Storage Tank Program
>
PR0231547
>
COMPLIANCE INFO_1985-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2023 2:12:37 PM
Creation date
6/23/2020 6:49:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-2007
RECORD_ID
PR0231547
PE
2361
FACILITY_ID
FA0003848
FACILITY_NAME
Verizon Business: KINGCA
STREET_NUMBER
13850
Direction
N
STREET_NAME
DE VRIES
STREET_TYPE
RD
City
LODI
Zip
95240
APN
05524018
CURRENT_STATUS
01
SITE_LOCATION
13850 N DE VRIES RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231547_13850 N DE VRIES_1985-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
401
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Oct 16 07 07:21 p Sheila Wallace 9256897921 p.15 <br />The following is a Statement of Work to upgrade the existing UST Piping & Turbine at the site listed above <br />to all VERIZON Standard UST Plans & Specifications and to meet and/or exceed the State of California <br />and VERIZON UST environmental requirements: <br />The existing UST turbine and piping installation does not comply with the UST installation guidelines set <br />forth by the State of California ami VERIZON's UST Specifications. With completion of the following, <br />the UST will be in full compliance. <br />�.'. :.; •` a.� .:: 1:1.''. t e .:1� X113 s. :1. r• 1...., - !:: M I 'M <br />►M ,: ,. F ::�'. <br />Tr stainlessOnly p:: 7 ed materials t. t the Statement of Work shall be acceptable unless <br />vdiemise approved in writinginstallation. <br />The Contractor shall ensure that all One Calls have been made and the local VERIZON Field Engineer <br />notified before any excavation begins. <br />The typical work week for Contractors shall be (6) 10 -hour days. The VERIZON project planning <br />Calendar is provided on the last page of this document. <br />Contractor shall provide a portable toilet for the duration of the _project. <br />2.1 Site Preparation and Excavation of the UST Components <br />2.1.1 Excavate and expose approximately the top 301/6 of the existing 550 -gallon <br />Xerxes fiberglass double wailled, diesel fuel tank. The existing burial depth is 29" <br />from the existing ground elevation to the top of the steel manway lid. Enough of <br />the UST is to be exposed to allow the installation of a new 42" polygonal <br />fiberglass turbine and all associated fuel and vent lines. <br />2.1.2 All excavated material shall be removed from the site and properly disposed of, <br />with the exception to the Top Rock and pea gravel. The existing Top Rock and <br />pea gravel may be reusW if the material is kept clean. <br />2.1.3 Remove the two (2) existing 4" pipe bollards, if required. The plastic covers on <br />these units will be reinstalled at the completion of the project. <br />2.1.4 If any minor shoring for the partW excavation is required, the total cost shall be <br />included within the project. <br />2.1.5 All existing buried fuel lines, primary and secondary, including the vent line <br />shall be excavated and removed. Any related conduit and wiring shalt also be <br />removed and all properly disposed of <br />2.1.6 Contractor shall take soil samples and analyze for petroleum content in <br />accordance with all applicablle State and Local Regulations or shall <br />verify testing protocol with Verizon before the tests are collected Laboratory <br />turn around shall be 24 hours. If petroleum 'impacted soils are present, the <br />Contractor is to contact Robert Mahan, who will then notify the appropriate <br />authorities. The Ckmtractor is not to contact the authorities directly, under any <br />circumstances. <br />2.1.7 In the event the Contractor shall require the use of a 2" water pump or less <br />during the duration of the UST piping upgrade, the cost of the pump and labor <br />are to be included within the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.