My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DE VRIES
>
13850
>
2300 - Underground Storage Tank Program
>
PR0231547
>
COMPLIANCE INFO_1985-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2023 2:12:37 PM
Creation date
6/23/2020 6:49:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-2007
RECORD_ID
PR0231547
PE
2361
FACILITY_ID
FA0003848
FACILITY_NAME
Verizon Business: KINGCA
STREET_NUMBER
13850
Direction
N
STREET_NAME
DE VRIES
STREET_TYPE
RD
City
LODI
Zip
95240
APN
05524018
CURRENT_STATUS
01
SITE_LOCATION
13850 N DE VRIES RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231547_13850 N DE VRIES_1985-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
401
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Oct 16 07 07:20p Sheila Wallace 9256897921 p.12 <br />2.3.12 The interstitial monitor riser at this facility has been incorporated into the <br />fiberglass turbine enclosure. This riser assembly shall be installed in a 4" by <br />l8", SCH 40 ASTM A-120 steel riser pipe. The cap and adaptor for this riser <br />shall be EBW PIN 90037, equipped with the proper size wire grip. The wire grip <br />shall also be properly sealed with clear GE Silicone. <br />2.3.13 A single run of secondary piping shall be installed to contain both fuel lines. <br />This piping shall be Environ GeoDuet GDP 45001, 4" phAng. The new bulkhead <br />fittings for the fuel lines shall be Environ DEB -7450 flwdble double entry boot <br />with an Environ SRD-1075 split reducer donut. At the point where both fuel <br />lines exit the soil at the shelter, a Total Containment Termiinadon Assembly, <br />TA4500 and an Environ SRD-1075 split reducer dowA (fuel lines) and Envmm <br />15-D rubber reducer donut (vent) shall be installed. Please note that the <br />termination assembly is to be installed in such a manner that the nibbcr portion <br />of the assembly is 4 inches clear of the top sock. Also, after the pdmaty piping <br />has been histalled, the conduit system is to be <br />2.3.14 The pfimary supply and return fuel lines shall be Environ GeoFlex Plus -D <br />piping. The supply line shall) be PGF 2075-D (3I4") and the witun, PGF -2 100-D <br />(1"), double walled flexible piping. The supply piping shall be installed using <br />Environ SPC -0075 swivel couplings and SFA -7575 adapters, and the return <br />piiping shall be installed using Environ SPC -0100 swivel couplings and SFA - <br />1010 adapters Four (4) standard test boots, (2) STB -0075 and (2) STB -0100, <br />will be required to co te the installation. Please note that the reducer donuts <br />at the building shall be permaneady seaW. <br />2.3.15 Remove the existing above grade supply and return piping at the exterior of the <br />generator shelticr, including 'Jisolation boot where below grade piping transitions <br />into above grade pipow, Remove the existing gate valve located on the supply <br />line before it eaters the shelter. <br />2.3.16 Provide a new TC (Total Containment) PIN TA -4500, Termination Assembkv <br />and (1) Environ P/N SRU -10"75, Split reducing donut at location 3/4 Fuel <br />oil supply and 1" fuel oil return stub up from below grade. Termination <br />assembly is to be 'installed in such a manaer that the rubber portion of the <br />assembly has 4" clear of the top rock. It shall be noted that the existing <br />penetrations into the bWkbng shall be reused. <br />2.3.17 Run new SCH 40-3/," steel fuel oil supply piping up into building penetration. <br />Provide (1) 3/.i' isolation ball valve in vertical before piping mrsts into wall <br />penetration. Ball valve shall be suitable for diesel fuel applications. Provide hot <br />dipped gah=zBd piping supports on either side of valve. Ball valve handle <br />shall be removed and fastened to side of valve with zip tie. <br />2.3.18 Run new SCH 40-1" Buck steel fuel oil return piping up into exisling building <br />penetiafion. Provide hot dipped pIvanized piping supports where <br />2.3.19 Any unused penetrafions, as well as worn areas of the exterior of the genwaor <br />sheher shall be sealed and finished to snatch existing. Tbis induudes area of <br />shelter skid where 'isolationvaive was removed. <br />2.3.20 A single ran of secondary piping shall be installed to contain the vent line. This <br />line shall be Environ GedDuct GDP -45001, 4" The new bulkhead fitft <br />at the twbme enclosure for the vent line shall be Environ DEB -7415 flexible <br />double entry boot. At the point where both the vent lime edits the soil at the <br />fence past, a Total Containment Ternunation Assembly, TA -4500 an FxMron <br />RRD-4015 robber reducer donut shall be installer:. Please note that the <br />
The URL can be used to link to this page
Your browser does not support the video tag.