Oct 16 07 07:20p Sheila Wallace 9256897921 p.11 <br />termination assembly is to be installed in such a manner that the rubber portion <br />of the assembly is 4 inches clear of the top rock. After the primary piping has <br />been installed, the conduit system is to be sealed. <br />2.3.21 The new primary vent Line shall be Environ GeoFiex-D, PGF -2150-D, 1-1/2" <br />double walled flexible piping. The vent piping shall be installed using an <br />Environ SPC -0150 swivel coupling and SFA -1515 adapter. One STB -0150 <br />standard test boot will be required to complete the installation. An Environ <br />RRD-4015-D reducer donut will be used to seal the vent line at the fence post. <br />Please note that the test boots and conduit system at the fence post and the <br />turbine enclosure shall be permanently sealed. A new pressure vacuum vent, <br />E13W P/N 802-303-02 shall be installed upon the existing vent riser. Please note <br />that the existing vent riser may need to be extend. <br />2.3.22 Upon •1 IY •p. - \ • 1 Yall piping installation, pipingincluding the - ' -t % u t <br />shall 1.. tested, per <br />Environ Specifications.1'.' Twbine <br />shall be hydrostatically <br />tested per VERIZON Specifications. Signed docunicutation with the VERIWN <br />Field Engineers signature is required to be submitted with final UST Upgrade <br />Documents. In addition to the VERIZON requin:41 test, -the Conwactor will also <br />1.. required tocomplete any additional:. :/ e1 by W Department <br />during the construction period. All lests shall be property documented and all <br />must be witnessed by the VERIZON Field Engineer <br />2.3.23 The fuel line trenches shall be a minimum depth 18" and the fuel lines are to <br />have a minimum of 3" of 3/8" to 3/a" pea gravel, above and below the 4i' conduit <br />piping. The conduit shall have a mininnan of 1/2" per foot fail to the turbine and <br />shall be graded to lie on straight plane without dips or rises. The pea gravel is to <br />be completely encapsulated in filter fabric 3401 or 3341 / <br />Hoechst Tmvira 51120 / Phillips Supac 4NP). The remaindu of the trench shall <br />be filled to match the base material grade with 1-112" w/fines Class "A" <br />Limestone road base. Material to be compacted to 95% compaction using a <br />mccharical compacting device. Then Tap Rock shall be installed to match the <br />existing material in size and color. The Top Rock shall be vibe plated after <br />instatiation. Please note that samples are to be snbraitted to the VERiZON Field <br />Engineer for approval on pea gravel, base materid and top rock before the <br />material is delivered to the site. <br />2.3.24 The area around the UST turbine enclosure is to 6e back filled with 3/8" to 1" <br />smooth pea gravel to a depth of 1 foot above the top of the UST or 4 inches <br />above the associated UST piping, which ever one is greater. The pea gmvel shall <br />be covered and sealed around the edges with geotextile fabric as specified in <br />2.3.29. The remainder of the accavation. shall be filled to subgrade with 1-1/2" <br />w Class "A" Limestone road base. Material to be installeti in 6 inch lifts <br />and compacted to 95% compaction using a mechanical compacUng devise. <br />Please note that samples are to be submitted to the VERiZON Field Engineer for <br />approval on pea gravel, base matezial and top rock before the matenal is <br />delivered to the site. <br />11M r; i V{tr , 1► # <br />..'t: 't: 11: 'J 1.. i \ / i i •.# 11'." • 1 • t: 1.1. iti . <br />. 1 �#. <br />tl- i � 11" i 1' i.• i.'. 1' C'.it v.# r! I..r ' I 1 1. 111 �.. <br />•. n r- •t r �+ - #' tarlr a run: It ' i�l l ' c1 1 11 ii <br />1.{: ;1' +a ..; - • r- {:w. SI". r... i/. I{- -i,rtt.a:l'. 1. - #.. .a•a <br />