Laserfiche WebLink
Monitoring System Certification <br />For Use By All Jurisdictions Within the State of California <br />Authority Cited: Chapter 6.7, Health and Safety Code; Chapter 16, Division 3, Title 23, California Code of Regulations <br />This form must be used to document testing and servicing of monitoring equipment. A separate certification or report must be prepared for each monitoring <br />system control panel by the technician who performs the work. A copy of this form must be provided to the tank system owner/operator. The owner/operator <br />must submit a copy of this form to the local agency regulating UST systems within 30 days of test date. <br />A. General Information <br />Facilty Name: Verizon KINGCA <br />Site Address: 13850 Devries <br />Facility Contact Person: Colby Hoepfner <br />Make/Model of Monitoring System: Pneumercator TMS2000 <br />B. Inventory of Equipment Tested/Certified <br />Check the appropriate boxes to indicate specific equipment inspectedlserviced: <br />Bldg. No.: <br />City: Lodi <br />Zip: <br />Phone: (972) 729-5182 <br />Date if Testing/Service: 09/13/07 <br />Tank ID: Diesel <br />Tank ID: <br />❑✓ In Tank Guaging Probe. <br />Model: 450 <br />❑ In Tank Guaging Probe. <br />Model: <br />❑✓ Annular Space Sensor. <br />Model: LS610 <br />❑ Annular Space Sensor. <br />Model: <br />❑✓ Piping Sump / Trench Sensor(s). <br />Model: LS600 <br />❑ Piping Sump / Trench Sensor(s). <br />Model: <br />❑ Fill Sump Sensor(s). <br />Model: <br />❑ Fill Sump Sensor(s). <br />Model: <br />❑ Mechanical Line Leak Detector. <br />Model: <br />❑ Mechanical Line Leak Detector. <br />Model: <br />❑ Electronic Line Leak Detector. <br />Model: <br />❑ Electronic Line Leak Detector. <br />Model: <br />❑ Tank Overfill / High Level Sensor. <br />Model: <br />❑ Tank Overfill / High Level Sensor. <br />Model: <br />Other (specify equipment tyRe and model in Section E on Page 2). <br />Other (specify a ui ment a and model in Section E on Page 2 . <br />TanklD: <br />TanklD: <br />❑ In Tank Guaging Probe. <br />Model: <br />❑ In Tank Guaging Probe. <br />Model: <br />❑ Annular Space Sensor. <br />Model: <br />❑ Annular Space Sensor. <br />Model: <br />❑ Piping Sump / Trench Sensor(s). <br />Model: <br />❑ Piping Sump / Trench Sensor(s). <br />Model: <br />❑ Fill Sump Sensor(s). <br />Model: <br />❑ Fill Sump Sensor(s). <br />Model: <br />❑ Mechanical Line Leak Detector. <br />Model: <br />❑ Mechanical Line Leak Detector. <br />Model: <br />❑ Electronic Line Leak Detector. <br />Model: <br />❑ Electronic Line Leak Detector. <br />Model: <br />❑ Tank Overfill / High Level Sensor. <br />Model: <br />❑ Tank Overfill / High Level Sensor. <br />Model: <br />Other (specify ui ment type and model in Section E on Page 2). <br />El Other (specify equipment a and model in Section E on Page 2). <br />Dispenser ID: <br />Dispenser ID: <br />❑ Dispenser Containment Sensor. <br />Model: <br />❑ Dispenser Containment Sensor. <br />Model: <br />❑ Shear Valve(s). <br />❑ Shear Valve(s). <br />Dispenser Containment Floa s and Chain(s). <br />f3Dispenser containment Float(s) and Chain(s). <br />Dispenser ID: <br />Dispenser ID: <br />❑ Dispenser Containment Sensor. <br />Model: <br />❑ Dispenser Containment Sensor. <br />Model: <br />❑ Shear Valve(s). <br />❑ Shear Valve(s). <br />Dispenser Containment Float(s) and Chain(s). <br />0 Dispenser Containment Float(s) and Chain(s). <br />Dispenser ID: <br />Dispenser ID: <br />❑ Dispenser Containment Sensor. <br />Model: <br />❑ Dispenser Containment Sensor. <br />Model: <br />❑ Shear Valve(s). <br />❑ Shear Valve(s). <br />Dispenser Containment Float(s) and Chain(s). <br />Di enser Containment Float(s) and Chain(s). <br />"If the facility contains more tanks or dispensers, copy this form. Include information for every tank and dispenser at the facility. <br />C. Certification - I certify that the equipment identified in this document was inspected/serviced in accordance with the manufacturers' <br />guidelines. Attached to this certification is information (e.g. manufacturers' checklists) necessary to verify that this information is correct and <br />a Plot Plan showing the layout of monitoring equipment. For any equipment capable of generating such reports, I have also attached a copy of <br />the report; (check all that apply): <br />Technician Name: Robert Henninger <br />Certification No.: 10588 <br />Testing Company Name: Balch Petroleum <br />Site Address: 930 Ames Ave, Milpitas, CA <br />0 System set-up Q Alarm History Report <br />Signature: <br />Liscense No.: 396575 A TB -1 C-10 / HAZ <br />Page 1 of 3 <br />Phone No.: 408-942-8686 <br />Date of Testing/Service: 09/13/07 <br />