Laserfiche WebLink
S WRCB"January 2002 <br />SECONDARY PIPE TESTING <br />Page of <br />Test Method Developed By: 0 Piping Manufacturer ndustry Standard 0 Professional Engineer <br />0 Other (Specify) <br />Test Method Used: !2Pressure 0 Vacuum 0 Hydrostatic <br />0 Other (Specify) <br />Test Equipment Used: <br />Equipment Resolution: <br />im—E-M <br />Piping Run # <br />Piping Run 4 <br />Piping Run Piping Run # <br />Piping Material: <br />Piping Manufacturer: <br />L) <br />Piping Diameter: <br />Length of Piping Run: <br />Product Stored: <br />Method and location of <br />piping -run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />1� <br />Test Start Time: <br />Initial Reading (RI): <br />Ld S <br />Test End Time: <br />qS, <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF -R,): <br />Pass/Fail Threshold or <br />Criteria: <br />Test ResultsP <br />A .0 -A <br />A Qlpasg­�b Fail <br />.0 Pass:.*:'%. 0 Fail <br />J <br />:[jPass D Fail <br />Comments — (include it ort repairs made prior to testing, aril recomwnded follow-up for failed tests) <br />