Laserfiche WebLink
SWRCR, January 2002 0 <br />%_ PTPTNf_ CYTMU 'rV Q rYXTr <br />Page of <br />Comments — (include i� formation on repairs made prior to testing and recommended follow-up for failed tests) <br />1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to Au of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />LV E u \ V <br />Test Method Developed By: ❑ Sump Manufacturer ndustry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: C Pressure ❑ Vacuum C -Hydrostatic <br />❑ Other (Specify)Test <br />Equipment Used Equipment Resolution <br />�,�� j • �T4� -.Z � Y3 A3.f+•.l^��"A i� .[ . i .. W lw,.. . b _ tr.'... .yf y....;w.i #+y t :+: � ...i, .5.�'�:. r :i.+i'f- _.n <br />",',�.• Sump # <br />Sump # <br />,..-•.., _,... Sump # Sump # <br />Sump Diameter: �3 Zai - <br />Sump Depth: S <br />Sump Material: <br />PL1 <br />Height from Tank Top to Top of <br />Highest Pi in Penetration: <br />it <br />13 <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to testing: <br />L <br />Portion of Sump Tested' <br />'t AQbOQ doo �- <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />C Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA ❑ Yes ❑ No 0 NA <br />❑ Yes ❑ No ❑ NA <br />Turbine shutdown response time <br />Is system programmed for fail-safe <br />shutdown? <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Was fail-safe verified to be <br />operational?* <br />❑ Yes ❑ No CNA <br />❑ Yes ❑ No ❑ 17A ❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />P r-, 1 <br />Test Start Time: <br />SSS <br />Initial Reading (Rj): <br />Test End Time: <br />!� <br />Final Reading (RF): <br />Test Duration: <br />o M t <br />Change in Reading (RF-R,).- <br />RF-RI):Pass/Fail <br />Pass/FailThreshold or Criteria: <br />Test Result: <br />ET, Pass ❑ Fail <br />❑ Pass ❑ Fail ❑ .Pass ❑ Fail <br />❑ Pass D Fail <br />Was sensor removed for testing? <br />?T -es ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testin ? <br />J�,Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Comments — (include i� formation on repairs made prior to testing and recommended follow-up for failed tests) <br />1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to Au of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />