Laserfiche WebLink
FEB.25.2003 10:44AM OTT CO N0.615 P.20i40 <br />SWRQ3, January 2002 <br />Page of <br />S. SECONDARY PIPE TRSMG <br />Test Method Developed By: 0 Piping Manufacturer RIndustry Standard 0 Profwsiotxal En eea <br />0 Ocher (s pec ) <br />Test Method Used: sure p vacuum ❑ Hydrostatic <br />Other (Specify) <br />Test Equipment Used <br />Equipment Resolution: <br />IOU r -I <br />Aja. n n •;+�N ;r IT x . Pipi aun # � piping Rttn P1i1111Q �.Uit # � rfl9itlCr <br />s�� <br />In <br />lt•'�rrr: <br />■ � r <br />Piping Material: <br />---------- <br />Piping manuthcturer <br />piping Diarneten <br />Length of Piping Run: <br />Product Stored: <br />Method and location of <br />, <br />piRing-qun isolation: <br />Wait time bettweerz applying <br />pressurelvacuumlwater and <br />statin testa <br />Test Start Time: <br />Initial Reading (Rt): <br />Test End Time: <br />Lob <br />Final Reading (RP): <br />i <br />Test Duration: <br />Change in Reading (P -E ): <br />pass/Fail Threshold or <br />Criteria: <br />O <br />Test+ Result: <br />Pass 0 veil ' <br />s�� <br />In <br />lt•'�rrr: <br />■ � r <br />