Laserfiche WebLink
S WRZCB,January 2002 AML Page 3 of <br /> Ir 0 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: aping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> f'Other(Speck) <br /> Test Method Used: 'pressure D Vacuum ❑Hydrostatic <br /> ✓❑`'Other(Sped) <br /> Test Equipment Used ?`,e 55 t,(.V e S te' Equipment Resolution ► <br /> Piping Run# Piping Run# Piping Run# )3aping Ru®# <br /> Piping Material: u„ ( <br /> f <. �a4 � � C.-$ , �i�✓ SSS <br /> Piping Manufacturer: ` -� s � -G7 <br /> Piping Diameter: '° <br /> Length of Piping Run: } 1 2 0 ivy® k K D t v. . 5 d <br /> Product Stored: <br /> Method and location of /,,a4-e-t -i-- -r,� pa 4 ,� enc <br /> ez <br /> piping-run isolation: t t �!+ ! 1, V lg 6-9 V-1 <br /> Wad., ' e between applying <br /> pressure/ cuum/water and <br /> stein-'test: kA 1 �- 3, r, r,z.� U ►�r�.� . <br /> Test Start Time: 73 : 00 7 St) 7.' Ycj <br /> Initial Reading(R): <br /> Test End Time: : 6e) p Ci Y(3 <br /> Final Reading(RF): 5 1) g <br /> Test Duration: u vu <br /> Change in Reading(RF-R,): S S 'W's <br /> Pass/Fail Threshold or <br /> Criteria: No (-0!55 i-" <br /> t�S2 ND (��g 7esc i0 NU ss ;z.11S. <br /> Test Result: Al. Pass ❑Fail P-Pass ❑Failass ❑Fail ❑ Pass ❑Fail <br /> Comments-(include information on repairs made prior to testing, and recommended ollow-up for failed tests) <br />