Laserfiche WebLink
S WRCB,January 2002 Page of —7 <br /> 6. PIPINGS TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard XProfessional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure O�Vacuum ydrostatic <br /> ❑Other(Sped) <br /> Test Equipment Used: (f4 t c We I "v4 �a I r n,*-dr Equipment Resolution: 6o 4. <br /> Sump# Sump# Z_ Sump# 3 Sump# <br /> Sump Diameter: W, <br /> Sump Depth: '� S , i S<( ' <br /> Sump Material: :.® gem m Iry (4 syr 1�s S S <br /> Height from Tank Top to Top of P roa c+ 11 .I g ea <br /> Hi est Pip!!Ig Penetration: PV .),t << I E 5 e <br /> Height from Tank Top to Lowest V1 <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Y Vj � <br /> Portion of Sump Tested' 7 4N bele 37 <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Ylles ❑No ❑NA `<Yes El No ❑NA $Yes ❑No ❑NA ❑Yes ❑N ❑NA <br /> oduct and water?� <br /> Turbine shutdown response time ,r.' <br /> Is system programmed for fail-safe t <br /> shutdown?` U�Ves ❑No ❑NA ,IrYes ❑No ❑NA Oyes ❑No ❑NA ❑Yes D o ❑NA <br /> i <br /> Was fail-safe verified to be ❑yes 'No ❑NA ❑Yes ?No ❑NA ❑Yes _t;�Qo ❑NA ❑Yeso ❑NA <br /> Wait time between applying <br /> pressure/vacu d starting <br /> test: / 0 ,1r e 5 /p w-<r <br /> "Avt A <br /> Test Start Time: -Z ; 3 T_ .7 . 7_,- 1 ; <br /> Initial Reading(R): F 81 5 efV1 �=r�s L �'rc< 'a C-°J�5 4 C ('q <br /> Test End Time: 2)-, v�_® Z ' -5-5— <br /> Final <br /> SFinal Reading(RF): r -, G" c% Frs;,S1 �.�c.(. <br /> Test Duration: t�r,,aw ..�� ✓ f fca �s ✓ ✓� �^'lceas> `F <br /> Change in Reading(RF-Ri): cPL , ,cE, r. �,ra .ze-—el, <br /> 1 <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: Pass ❑Fail 0-Pass ❑Fail ass ❑Fail ❑ Filass ❑Fa <br /> Was sensor removed for testing? Yes ❑No O NA es ❑No ❑NA es ❑No ❑NA ❑Y ❑No ❑NA <br /> Was sensor properly replaced and es ❑No ElNA es ❑No ❑NA -`t`es ❑No ❑NA ❑ es ❑No 13N <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to ggy of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />