Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: X Pressure ❑Vacuum El Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution:0-15 PSI <br /> MWAINNEEM <br /> Piping Run#1 Piping Run#2 Piping Run#3 Piping Run# <br /> lPippmgg <br /> Fiberglass Fiberglass Fiberglass <br /> Smith Smith Smith <br /> 'Diameter: 3" 3" 311 <br /> Length of Piping Run: 180' 50' 180' <br /> Product Stored: Premium Diesel Regular <br /> Method and location of Test boot Test boot Test boot Test boot <br /> piping-run isolation• <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min 5 min <br /> starting test: <br /> Test Start Time: 11:25 11:25 11:25 <br /> Initial Reading(R1): 5 PSI 5 PSI 5 PSI <br /> Test End Time: 11:55 11:55 11:55 <br /> Final Reading(RF) 5 PSI 5 PSI 5 PSI <br /> Test Duration: 30 min 30 min 30 min 30 min <br /> Change in Reading(RF-Ri): 0 0 0' <br /> Pass/Fail Threshold or 0 drop 0 drop 0 drop 0 drop <br /> Criteria: <br /> TtResalt; `;: x Pass L ,Fail XIPa ❑Fail Pass ❑Fail. ;" ❑ Pass 0"Fa>7C <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />