Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 6. PIPING UMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard X Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Caldwell Systems Equipment Resolution: .005/30 min <br /> Room=NEEMENEENEEM <br /> Sump#1 Sump#2 Sump# Sump# <br /> Sump Diameter: 42" 42" 4T' <br /> Sump Depth: 60" 60" 60" <br /> Sump Material: Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 15" 17" 15" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 25" 24" 23" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry` Dry Dry <br /> Portion of Sump Tested' 2"above Highest piping penetration <br /> Does turbine shut down when <br /> sump sensor detects liquid(both x Yes ❑No ❑NA D Yes ❑No ❑NA x Yes ❑No ❑NA ❑Yes D No ❑NA <br /> roduct and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe <br /> shutdown?R x Yes ❑No ❑NA x Yes ❑No ❑NA x Yes ❑No DNA ❑Yes ❑No ❑NA <br /> Was fail-safe verified to be ❑Yes x No D NA ❑Yes x No ❑NA ❑Yes x No ❑NA D Yes D No ❑NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 min 5 min 5 min 5 min <br /> test: <br /> Test Start Time: 10:47 11:50 12:38 <br /> Initial Reading(RI) .00" .001, .00" .00" <br /> Test End Time: 11:17 12:20 1:08 <br /> Final Reading(RF): .00 .00 .00 <br /> Test Duration: 30 min 30 min 30 min 30 min <br /> Change in Reading(RF-RO: .00 .00 .00 <br /> Pass/Fail Threshold or Criteria: .005/30 min .005/30 min .005/30 min .005/30 min <br /> Test Result x Pass :' ❑Fail" ass; ❑'Faai z, Pass F011:. ❑ Pass ❑Fail <br /> Was sensor removed for testing? x Yes ❑No DNA x Yes ❑No ❑NA x Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and x Yes ❑No ❑NA x Yes D No ❑NA x Yes ❑No 0N ❑Yes ❑No ❑NA <br /> verified functional after testin ? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 'If the entire depth of the sump is not tested,specify how much was tested. If the answer to PAY of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />