Laserfiche WebLink
e A <br /> .SWRCB,January 2002 Page of <br /> 7. UNDER-DISPENSER CONTAINMENT C TESTING <br /> Test Method Developed By: ❑UDC Manufacturer ❑Industry Standard X Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> O Other(Spec) <br /> Test Equipment Used: Caldwell Systems Equipment Resolution: .005/30 min- <br /> UDC#1&2 UDC#3&4 UDC#5&6 UDC#7&8'' <br /> UDC Manufacturer: Western Western Western Western <br /> UDC Material: Fiberglass Fiberglass Fiber ass Fiberglass <br /> UDC Depth: 28" 28" 2811 2819 <br /> Height from UDC Bottom to Top 10" 10" W1 10" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 7" 7 7" 7" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Dry Dry Dry Dry <br /> testing: <br /> Portion of UDC Tested 2"above Highest Piping Penetration <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both x Yes O No ❑NA x Yes ❑No ❑NA x Yes ❑No p NA x Yes ❑No ❑NA <br /> roduct and water)9* <br /> Turbine shutdown response time <br /> Is system programmed for fail- x Yes ❑No ❑NA x Yes ❑No >❑NA x Yes ❑No ❑NA x Yes ❑No ❑NA <br /> safe shutdown? <br /> Was fail-safe verified to be ❑yes x No ❑NA ❑Yes x No ❑NA 0 Yes x No ❑NA ❑Yes x No ❑NA <br /> op erational?` <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min 5 min <br /> starting test <br /> Test Start Time: 1:15 1:45 1:23 1:58 <br /> Initial Reading(RO: .00" .00" .00" .00" <br /> Test End Time: 1:45 2:15 1:53- 2:28' <br /> Final Reading(RF): .00 .00 .00 .0025 <br /> Test Duration: 30 min 30 min 30 min 30 min <br /> Change'n Reading(RF-R): .00 A0 .00 .0025 <br /> Pass/Fail Threshold or Criteria: .005/30 min- _.005/30 min .005/30 min .005/30 min <br /> Test.Resnit .. Pass ''- L1 Fail. ,Pass`:' ❑Fail , ; x Pass. ::CIFail x Pass, `'CIFa�I. <br /> Was sensor removed for testing? x Yes ❑No O NA x Yes ❑No ❑NA x Yes ❑No ❑NA x Yes ❑No ❑NA <br /> Was sensor properly replaced and x Yes ❑No ❑NA xYes O No ❑NA x Yes ❑No ❑NA x Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> a If the entire depth of the UDC is not tested,specify how much was tested. If the answer to M of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LC-160) <br />