Laserfiche WebLink
PTjBLIC HEALTH jFRVICES <br />i0.1.::i.iNNA Nf D. N! r a. <br />3.... tit; itc. <br />P.O. Box 2009 • ('601 East Fi2clton AN=uc) ® Stock --ton, Caldotrda 95201 <br />(209) 468-300 <br />TO: INSTALLERS AND OWN -ERS OF \7_W UNMERGROUND STORAGE TA.\XS <br />San Joaquin County Public Health Sertiices-Environmental Health Division (PNS-EHD) has established the <br />following guidelines to assist Jou in the completion of your construction project The guidelines specify the <br />construction and monitoring criteria necessary to complete our review of your proposed underground storage <br />tank (UST) system. <br />1. SL'Bhf T T.4L OF PLANS <br />a. Submit 3 complete sets of detailed drawings in non -erasable print to the Environmental <br />Health Division. Upon approval, one set will be retained by the department and the other <br />two will be returned. <br />b. Include equipment and material specification sheets and manufacturer's brochures describing <br />operating and monitoring systems and listing numbers or other evidence of a nationally <br />recognized testing organization approval. <br />C. Include detailed monitoring and response plans for facility. <br />d. The drawn to scale plot plan should illustrate the location of all existing and proposed <br />structures, including e. sting UST(s). <br />e. The plats should include a cross sectional diagram of the tank and piping system including <br />secondary containment, overflow protection equipment, and extension of all pipes and;cr <br />ports from subgrade to finish grade. <br />2. PLAN RQTM A.A'D OPERATING PERMIT FEES <br />a. New facility plan review fee of S624.00 (8 hour minimum per facility), 51;0.00 fee per tank, <br />plus S56.00 state surcharge fee per tank is due at time of plan submittal. <br />b. NTew installation of additional tank nt an existing facility is S624.00 plan review fee (8 hour <br />minimum per facility) plus S170.00 fee per new tank, and 556.00 per tank state surcharge fee. <br />C. It should be noted that a S624.00 plan review check fee required for each submittal allov.s <br />for up to eight (8) hours of staff review and/or inspection time. Additional time spent on <br />plan review, meetings, inspections, phone or office consultations vill be billed to the <br />applicant at a rate of 578.00 per hour. <br />d. The maximum review time for UST installation pians is 4.0 working days. A preliminary <br />review will be conducted by the ?HS/EHD within 20 working days of submittal date to <br />identify any gross plan deficiencies. <br />C. if gross deficiencies are ideniifled. the plans will be returned with checklist identifying plan <br />deficiencies. <br />To expedite the review of installation plans, time and a half per hour overtime fee may be <br />submitted to have review completed within 10 working days of submittal date. <br />A Daurnn of vn irracvrn C. ruin• HM11h r !A1c <br />