My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
2551
>
2300 - Underground Storage Tank Program
>
PR0231659
>
COMPLIANCE INFO_2007-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 1:47:03 PM
Creation date
6/23/2020 6:50:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2018
RECORD_ID
PR0231659
PE
2361
FACILITY_ID
FA0003849
FACILITY_NAME
Verizon Business: MANTECA
STREET_NUMBER
2551
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
19801005
CURRENT_STATUS
01
SITE_LOCATION
2551 E LOUISE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231659_2551 E LOUISE_2007-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In -Tank Gauging 1 SIR Equipment: p Check this box if tank gauging is used only for inventory control. <br />❑ Check this box If no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />* in the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): p Check this box if LLDs are not installed. <br />COMDlete the following checklist: <br />® Yes <br />Yes <br />❑ <br />No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />E] <br />Yes <br />a <br />No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />0 <br />Yes <br />[3 <br />No* <br />Was accuracy of system product level readings tested? <br />E] <br />Yes <br />❑ <br />No* <br />Was accuracy of system water level readings tested? <br />[E] <br />Yes <br />❑ <br />No* <br />Were all probes reinstalled properly? <br />El Yes <br />❑ <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* in the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): p Check this box if LLDs are not installed. <br />COMDlete the following checklist: <br />® Yes <br />No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all <br />N/A <br />that apply) Simulated leak rate: ❑3 g.p.h.;® 0.1 g.p.h ; ®0.2 g.p.h. <br />Yes <br />No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Yes <br />No* <br />Was the testing apparatus properly calibrated? <br />® Yes <br />No <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />N/A <br />® Yes <br />No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br />N/A <br />disconnected? <br />No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br />LYeNo* <br />N/A <br />fails a test? <br />No* <br />For electronic LLDs, have ail accessible wiring connections been visually inspected? <br />N/A <br />® No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />Monitoring System Certification Rage 3 of 4 12t07 <br />3 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.