My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
90
>
2300 - Underground Storage Tank Program
>
PR0231741
>
COMPLIANCE INFO_1986-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:18 AM
Creation date
6/23/2020 6:51:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2005
RECORD_ID
PR0231741
PE
2361
FACILITY_ID
FA0003657
FACILITY_NAME
AT&T Corp. - UE231
STREET_NUMBER
90
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
90 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231741_90 W TURNER_1986-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />Step 9 <br />'tape cover and mounting ring with duct tape to prevent <br />concrete from settling in the drAnage areas. <br />Pbur concrete per figure 2. <br />Notes Do not stand on spits coxhdmw before <br />concrete sets up. <br />Remove tape from cover after concrete has dried Remove <br />2djustment system. Adapter and tight fill cap can now be <br />installed in sealable cover models. <br />Re -ten the spill containers for leaks as dacribed in Step 8, <br />after the concrete has set up. <br />System — Stomiord Covin <br />C <br />Paso 9 <br />Cabra la tapa y el alto de wont* con cinta adhesiva <br />para tuberias, a fin de prevenir que el hormig6a entre en las areas <br />de dten:*. <br />Apligw ei hor aigbn de aeuerdo con la figura 2. <br />Nota: No se pare eaciura ded contexedor de derrmses <br />aates qua se enduretca ed bormigda. <br />Hemam la clout adhesiva de la tapa despues que el hormigon <br />se haya secado. Remum d sistema de aluste. <br />htstale d adaptador y la taps de Henado en los modem <br />con cubiertas seliables. <br />Gonda= nuevas pruebw para figs en los contenedores <br />de denames como x descrilx en el Paso 8, despuEs que el hormig6n <br />se ha endureddo. <br />Figure 3 <br />test oet System — (SC) <br />1 r <br />/ <br />� IIs <br />t <br />•. <br />t. <br />, <br />lI <br />Puttuaa <br />A DOVER RESOURCES 60MPANV <br />ii 4! <br />rF <br />ttr r V <br />9393 Princeton -Glendale Road <br />P.O. Box 405003 <br />Cincinnati, Ohio 45240.5003 <br />F 4 <br />Ph: (800) 422-2525 <br />Fax: (800) 4213297 <br />Intl Ph: (513) 870-3315 <br />Intl. Fax: (513) 870.9186 <br />O Copyrigiht 1997, OPW Fueling CnmImnents Printed in t :SA <br />
The URL can be used to link to this page
Your browser does not support the video tag.