Laserfiche WebLink
11 <br />Step 9 <br />'tape cover and mounting ring with duct tape to prevent <br />concrete from settling in the drAnage areas. <br />Pbur concrete per figure 2. <br />Notes Do not stand on spits coxhdmw before <br />concrete sets up. <br />Remove tape from cover after concrete has dried Remove <br />2djustment system. Adapter and tight fill cap can now be <br />installed in sealable cover models. <br />Re -ten the spill containers for leaks as dacribed in Step 8, <br />after the concrete has set up. <br />System — Stomiord Covin <br />C <br />Paso 9 <br />Cabra la tapa y el alto de wont* con cinta adhesiva <br />para tuberias, a fin de prevenir que el hormig6a entre en las areas <br />de dten:*. <br />Apligw ei hor aigbn de aeuerdo con la figura 2. <br />Nota: No se pare eaciura ded contexedor de derrmses <br />aates qua se enduretca ed bormigda. <br />Hemam la clout adhesiva de la tapa despues que el hormigon <br />se haya secado. Remum d sistema de aluste. <br />htstale d adaptador y la taps de Henado en los modem <br />con cubiertas seliables. <br />Gonda= nuevas pruebw para figs en los contenedores <br />de denames como x descrilx en el Paso 8, despuEs que el hormig6n <br />se ha endureddo. <br />Figure 3 <br />test oet System — (SC) <br />1 r <br />/ <br />� IIs <br />t <br />•. <br />t. <br />, <br />lI <br />Puttuaa <br />A DOVER RESOURCES 60MPANV <br />ii 4! <br />rF <br />ttr r V <br />9393 Princeton -Glendale Road <br />P.O. Box 405003 <br />Cincinnati, Ohio 45240.5003 <br />F 4 <br />Ph: (800) 422-2525 <br />Fax: (800) 4213297 <br />Intl Ph: (513) 870-3315 <br />Intl. Fax: (513) 870.9186 <br />O Copyrigiht 1997, OPW Fueling CnmImnents Printed in t :SA <br />