My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
90
>
2300 - Underground Storage Tank Program
>
PR0231741
>
COMPLIANCE INFO_1986-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:18 AM
Creation date
6/23/2020 6:51:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2005
RECORD_ID
PR0231741
PE
2361
FACILITY_ID
FA0003657
FACILITY_NAME
AT&T Corp. - UE231
STREET_NUMBER
90
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
90 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231741_90 W TURNER_1986-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />i) The engineer and geologist will prepare a letter report summarizing <br />the work performed, findings, and laboratory analysis results, <br />and will make recommendations for future cleanup work (if <br />necessary) and monitoring. <br />We believe that the above described work will assist in identifying the <br />extent of pollution or contamination at this A. T. & T. site. The work <br />should not be started until the probability of significant rainfall is <br />past. It is estimated that the time required to complete this <br />investigation as outlined below will be 12 to 16 days from resumption <br />of work to completion: <br />Description <br />Days <br />1. <br />Preparation <br />of site for <br />excavation <br />1 <br />2. <br />Identification <br />of wells <br />within 1,320 feet <br />of tank location <br />1 <br />3. <br />Sample and <br />sound five (5) <br />wells on <br />A. T. & T. <br />and nursery <br />property <br />1 <br />4. <br />Excavation <br />storage and <br />sampling of horizontal <br />3 to 5 foot <br />increments <br />of soil. <br />1-2 <br />5. <br />Laboratory <br />analysis of <br />sample sets from <br />incremental <br />excavations <br />2 <br />6. Review and summarize results, prepare maps, <br />diagrams, and letter report 2 <br />7. Meet the Client and San Joaquin County <br />Local Health District Staff (two meetings <br />maximum) 1 <br />The above work is for: <br />Owner: A. T. & T. <br />5925 West Las Positas Boulevard <br />Room 1140, Building G <br />Pleasanton, California 94566 <br />Phone: (415) 460-6531 <br />Contact: Judy McCarthy <br />5925 West Las Positas Boulevard <br />Room 1140, Building G <br />Pleasanton, CA 94566 <br />Phone: (415) 460-6531 <br />
The URL can be used to link to this page
Your browser does not support the video tag.