My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
90
>
2300 - Underground Storage Tank Program
>
PR0231741
>
COMPLIANCE INFO_1986-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:18 AM
Creation date
6/23/2020 6:51:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2005
RECORD_ID
PR0231741
PE
2361
FACILITY_ID
FA0003657
FACILITY_NAME
AT&T Corp. - UE231
STREET_NUMBER
90
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
90 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231741_90 W TURNER_1986-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />Ms. Lorrie Putu1a <br />Page 2 <br />April _18, ,1987 <br />5. Subsurface soil investigation and soil sampling at north -wall of <br />the existing excavation (4 feet±) south the nursery property line <br />fence. Soil samples will be taken only when San Joaquin County Local <br />Health District staff is present. Forty eight (48) hours notice <br />will be -given to the San Joaquin County Local Health District office <br />by Mr. L. Alex Moldenhauer, P.E_., T.T.I., the project engineer. <br />Samples will be taken in prescribed standard procedures, sealed, <br />held in cold storage, and delivered to Eureka Laboratory within 24 <br />hours of extraction. <br />a`) T.T.I. will provide an engineer and geologist on-site when <br />excavation and sampling _ is performed and will maintain a close <br />chain of custody. <br />b) Excavation will be made in 3 to 5 feet horizontal -increments <br />from the existing wall face northward a minimum of six feet (6') <br />and to a depth to be determined by the engineer and San Joaquin <br />County Local Health District staff. <br />c) A polypropolene sheet will be ,placed on the bottom of the existing <br />excavation from the north face of the existing excavation twenty <br />feet (20'±) south so that rolling earth will be contained on <br />the polypropolene sheet. <br />d) Excavated earth will be hauled to a location on the A. T. & T. <br />parking area and placed on a polypropelene sheet laid on the <br />A. C parking pad.Earth piled as described above will be covered <br />with a vapor barrier sheet of material that meets the San Joaquin <br />County Air Quality Control District's requirements. Stored earth <br />will be disposed of later in a manner approved by the San Joaquin <br />County Health District and/or -San Joaquin County Air Quality <br />Control District. <br />e) As the layered excavation proceeds north, a minimum of four (4) <br />soil samples will be taken every three (3) to five (5) feet of <br />horizontal distance. It is estimated that eight (8) to twenty <br />(20) soil samples will be taken during this work. <br />f) Soil samples __will_ be sealed, placed into cold storage, and <br />delivered to Eureka Laboratories, Sacramento, California, within <br />24 hours after extraction. <br />g) A three dimensional map will be prepared showing excavation limits, <br />sample locations, and laboratory results. <br />h) A geological classification of the soil from the drill holes <br />and excavated material will be prepared and shown on a three <br />dimensional diagram. <br />
The URL can be used to link to this page
Your browser does not support the video tag.