My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
90
>
2300 - Underground Storage Tank Program
>
PR0231741
>
COMPLIANCE INFO_1986-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:18 AM
Creation date
6/23/2020 6:51:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2005
RECORD_ID
PR0231741
PE
2361
FACILITY_ID
FA0003657
FACILITY_NAME
AT&T Corp. - UE231
STREET_NUMBER
90
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
90 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231741_90 W TURNER_1986-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W9!1211111 : <br />E <br />This section is subject to the General Conditions and Special <br />Provisions heading this specification as if herein repeated. <br />(a) Remove all four (4) fuel tanks shown on plan. Tanks No. I and <br />2 and connecting piping will be removed in the primary phase. <br />Disconnect and cap piping for Tank #4. Operate emergency <br />engine from Tank *3. Piping and tanks will in all cases be <br />disposed of as required by State and local agencies and proper <br />documentation turned over to owner that the State and Local <br />requirements have been satisfied. <br />(b) When new tank is installed in tank position No. I and the ne" <br />system completed and tested,, all fuel shall be filtered and <br />transferred from tanks No. 3 & No. 4 to the new tank. Tank <br />No. 3 & No. 4 complete with piping will then be removed and <br />disposed of above, as the second phase removal. <br />(c) Backfill hole with local soil, sand or gravel properly <br />compacted to support new roadway. <br />(d) If soil around tank is contaminated, remove soil and dispose <br />of same according to State and Local requirements. Proper <br />documentation will be turned over to the Omner. Per It <br />(e) Repaving of roadway and setting of new manholes shall be dom- <br />as final phase. Restore construction area to a condition as <br />near to original as possible. <br />(f) Paint all patched malls and all new piping and fittings to <br />match existing. <br />(9) Label all valves and piping in a similar fashion as <br />existing. In addition, valves shall be labeled 'ONO" or ONC" <br />(normally open or normally closed). <br />Spec B56K4W ORDER OF PROCEEDURE <br />IB -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.