My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
90
>
2300 - Underground Storage Tank Program
>
PR0231741
>
COMPLIANCE INFO_1986-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:18 AM
Creation date
6/23/2020 6:51:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2005
RECORD_ID
PR0231741
PE
2361
FACILITY_ID
FA0003657
FACILITY_NAME
AT&T Corp. - UE231
STREET_NUMBER
90
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
90 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231741_90 W TURNER_1986-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n <br />(a) Contractor warrants that the work done under the <br />agreement "ill be free <br />. - <br />-- from <br />workmanship andhereby agrees uponreceivingnotification <br />periodfrom AT&T to immediately remedy, repair or replace, <br />without cost to AT&T and to its entire satisfaction, all <br />defects, damages or imperfections appearing in the work <br />within a ■ 'f one date <br />completion andacceptance <br />of <br />work doneunder <br />_. <br />agreement; provided, however, thatl should the drawings <br />and specification provide any warranty of any materials <br />or workmanship in excess of the aforesaid one (1) year <br />period, then such warrantybe controlling as to the <br />materials •workmanshipcovered <br />._ tthereby. Neither _ <br />payments to Contractor or total or partial occupancy of <br />the work by <br />l shall relieve Contractorofthese <br />■ ■ <br />When e work completed, tshall ■ AT&T <br />that the work will be ready for a final inspection on a <br />definite date which shall be stated in the notice. The <br />notice shall be given at least two (2) days in advance of <br />such date. iarrangefor the presence at <br />this inspection of all subcontractors dealing with the <br />work as designate. <br />S. Time is of the essence of this contract; therefore, contractoi- <br />shall agree to carry his work, to the completion of the job, <br />with greatest possible dispatch. <br />x t �fill �l <br />Spec B56K482 SPECIAL PRE)VISIONS <br />1R-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.