My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
90
>
2300 - Underground Storage Tank Program
>
PR0231741
>
COMPLIANCE INFO_2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:18 AM
Creation date
6/23/2020 6:51:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2008
RECORD_ID
PR0231741
PE
2361
FACILITY_ID
FA0003657
FACILITY_NAME
AT&T Corp. - UE231
STREET_NUMBER
90
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
90 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231741_90 W TURNER_2006-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tait Environmental Services Designated Operator Monthly Inspection <br />UST Construction - Design - Maintenance • Compliance ChpCklict <br />Facili Name: AT&T Corporation Lodi: LODICA02 CAK482 <br />Date: 09/26/2007 <br />Facility Address: J110 W. Turner Rd. <br />1 <br />City: Lodi <br />IZJP Code: 95242 <br />Designated UST Operator Conducting the Inspection: Koffel Georc e <br />International Code Council Certification #: 5247982 -UC <br />Signature <br />Expiration Date: 12/19/2008 <br />Phone: 714-920-5387 <br />Item <br />MONITORING PANEL. l ALARM HISTORY <br />1 <br />Monitoring system is powered on and in operating mode <br />Yes <br />2 <br />Monitorinq system is not currently showing any alarms or warnings <br />Yes <br />3 <br />Alarm history report/log for the previous month is available, and has been reviewed by the <br />Design ted UST Operator Attach a copy of the alarm history report/logreport/log to this form if available <br />Yes <br />4 <br />Each alarm for the previous month has been responded to appropriately. <br />N/A <br />5 <br />Sensors located in tank -top containment sumps have not alarmed in the past month. <br />N/A <br />5a <br />List all tank -top sumps where alarms occurred in the past month: <br />Note: Sumps where an alarm has occurred in the past month must be inspected unless a qualified technician responded to, and properly <br />addressed, the cause of the alarm. Attach documentation verifying appropriate service to this report. If sump inspection is required, record <br />results in item 6 below. <br />UST SYSTEM INSPECTION <br />6 <br />Tank -top containment sumps are free of water, debris, and hazardous substance. Sensors are located properly. <br />Note: Visual inspection of sumps is only require in sumps where an alarm has occurred in the past month for which there is no service record <br />YIN I Deb I U <br />Y/N IDeb ILiq <br />Sump Location: Sump Location: <br />Sump Location: Sump Location: <br />Sump Location: Sump Location: <br />7 <br />Spill containment structures are free of water, debris and hazardous substance. <br />Tank 1 - Contents: Diesel <br />Yes <br />Tank 3 - Contents: <br />N/A <br />Tank 2 - Contents: <br />N/A <br />Tank 4 - Contents: <br />N/A <br />8 <br />Under -dispenser containment areas are free of water, debris, and hazardous substance. Sensors are located <br />ro erl . <br />Dispenser 1/2 <br />N/A <br />Dispenser 9/10 <br />N/A <br />Dispenser 3/4 <br />N/A <br />Dispenser 11/12 <br />N/A <br />Dispenser 5/6 <br />N/A <br />Dispenser 13/14 <br />N/A <br />Dispenser 7/8 <br />N/A <br />Dispenser 15/16 <br />N/A <br />PAPERWORK INSPECTION <br />DATE DONE <br />9 <br />Monitoring system certification has been completed within past 12 months. Yes <br />07/13/2007 <br />10 <br />Secondary containment tests have been completed within the re uired timeframe. Yes <br />09/09/9999 <br />11 <br />Spill containment structure bucket testing was completed within the past year. Yes <br />07/13/2007 <br />12 <br />Tank tightness testing was completed within required timeframe. N/A <br />13 <br />Line ti htness testing was completed within required timeframe. N/A <br />14 Other required testing/maintenance was completed within required timeframe. List test/maintenance items below. <br />Test/Maintenance: N/A <br />Test/Maintenance: N/A <br />Test/Maintenance: N/A <br />
The URL can be used to link to this page
Your browser does not support the video tag.