My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
90
>
2300 - Underground Storage Tank Program
>
PR0231741
>
COMPLIANCE INFO_2009-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:19 AM
Creation date
6/23/2020 6:51:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2012
RECORD_ID
PR0231741
PE
2361
FACILITY_ID
FA0003657
FACILITY_NAME
AT&T Corp. - UE231
STREET_NUMBER
90
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
90 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231741_90 W TURNER_2009-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Test Method Developed By: <br />❑ Sump Manufacturer <br />❑ Other (Specify) <br />® Industry Standard ❑ Professional Engineer <br />Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Incon Sump Tester Equipment Resolution: +/- 0.002" <br />Sump Diameter: <br />Sump Depth: <br />Sump Material: <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to testing: <br />Portion of Sump Tested' <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />Turbine shutdown response time <br />Is system programmed for fail-safe <br />shutdown?* <br />Was fail-safe verified to be <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />Test Start Time: <br />Initial Reading (RI): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF -RI): <br />Pass/Fail Threshold or Criteria: <br />Test Result: <br />Was sensor removed for testing? <br />Was sensor properly replaced and <br />verified functional after testine? <br />STP Sump # North <br />54" <br />42" <br />Fiberglass <br />16" <br />26" <br />STP Sump # South <br />54" <br />42" <br />Fiberglass <br />12" <br />30" <br />Good IGood <br />2" above piping 1 2" above piping <br />❑ Yes ❑ No ® NA 1 ❑ Yes ❑ No ®NA <br />M, <br />N/A <br />❑ Yes ❑ No ® NA 1 ❑ Yes ❑ No ®NA <br />30 minutes <br />12:04 pm <br />12:19 pm <br />4.1931 <br />4.1931 <br />12:19 pm <br />12:34 pm <br />4.1932 <br />4.1935 <br />15 min <br />15 min <br />+0.0001 <br />+0.0004 <br />+/-0.002" <br />o Pass ❑ Fail <br />® Yes ❑No❑NA <br />❑Yes ® No ❑ NA <br />30 minutes <br />12:04 pm <br />12:19 pm <br />2.7160 <br />2.7150 <br />12:19 pm <br />12:34 pm <br />2.7151 <br />2.7148 <br />15 min <br />15 nun <br />-0.0009 <br />-0.0002 <br />+/-0.00211 <br />El Pass ❑ Fail <br />® Yes ❑No❑NA <br />❑Yes ® No ❑ NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />"Sensor functionality was not confirmed, sensor was replaced properly. This procedure is not part of the Secondary <br />Containment testing scope of work". <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.