My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1991-1994
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2300 - Underground Storage Tank Program
>
PR0231746
>
COMPLIANCE INFO_1991-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:06:49 PM
Creation date
6/23/2020 6:51:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991-1994
RECORD_ID
PR0231746
PE
2361
FACILITY_ID
FA0003862
FACILITY_NAME
Marks Fuel & Food, Inc.
STREET_NUMBER
880
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
049-050-32
CURRENT_STATUS
01
SITE_LOCATION
880 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231746_880 E VICTOR_1991-1994.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
452
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SMITH FIBERGLASS PRODUCTS INC., A SUBSIDIARY OF A.O. SMITH CORPORATION <br />2700 West 65th Street - Little Rock, Arkansas 72209.8592 - Telephone: (501) 568-4010 - TWX NO. 910-722.7377 <br />The Smith Fiberglass Products double -wail secondary containment <br />system is designed for use with U.L. Listed RED THREAD® 11 pipe, <br />manufactured by Smith Fiberglass Products. Secondary contain- <br />ment systems consist of the next larger size of pipe and special <br />two-piece fittings. Refer to Manual 9474 or 1055 and Bulletin 1004 for <br />installation instructions for the U.L. Listed pipe and to Manual 9106 <br />for tapering tool operating instructions. <br />• <br />A. Containment Piping <br />Smith Fiberglass Products double-wall secondary contain- <br />ment sizes are: <br />Containment For Product <br />Pipe Size Pipe Size <br />3" RED THREAD 11 2" RED THREAD II <br />4" RED THREAD II 3" RED THREAD II <br />6" RED THREAD 11 '4" RED THREAD II <br />B. Containment Fittings <br />Available double-wall secondary containment fittings are 45° <br />elbows, 904 elbows, tees, nipples, couplings, and termination <br />concentric reducers (with or without 3/4" NPT threaded outlet). <br />C. Adhesive for Containment Piping <br />Use only DS -7014 or DS -7069 adhesive manufactured by <br />Smith Fiberglass Products for installation of Smith Fiberglass <br />Products double-wall secondary containment piping systems. <br />SECTION II <br />PREPARATION AND ASSEMBLY <br />A. Pipe Preparation <br />Cut off factory spigots and couplings as needed. Couplings <br />may be needed for making containment pipe size reductions <br />or straight pipe runs. Spigots may be needed for pipe runs or <br />for making a containment sump connection. <br />The ends of the containment pipe must be machined or <br />thoroughly sanded for a length of at least 33/4". Any surface <br />irregularities must be removed. This is most easily accom- <br />plished by using a Smith Fiberglass Products secondary con- <br />tainment scarfing adapter kit. This kit consists of a special <br />blade (33/4" long), blue blade holder, and 3" & 4" gauges which <br />are required to set the tool. The kit is easily adapted to the <br />2"-6" Smith Fiberglass Products standard tapering tool. <br />FRED THREAD is a registered trademark of Smith Fiberglass Products Inc <br />Manual 1190 <br />April 1, 1988 <br />Useful sections of Manual 9474: <br />— Tool and Equipment List <br />NOTE: For installation of bolts, use one of the following: <br />(1) A 3/8" variable torque impact wrench with 7/16" socket and <br />a 7/16" wrench <br />(2) A 1/4" drill with 7/16" socket and a 7/16" wrench <br />(3) Two 7/16" wrenches <br />— Storage and Handling <br />— Layout and Preparation <br />— Cutting <br />— Bonding/Adhesive Mixing <br />Assemble the mandrel and special blade holder per in- <br />structions in Manual 9106. Slide the proper size gauge all the <br />way to the back of the mandrel. Insert the special blade into <br />the blade holder with the square end leading and the wide <br />side next to the blade holder. The square end of the blade <br />must touch the tool body. <br />Rotate the tool body to the position shown in Figure 1 making <br />sure that the blade rests against the gauge. After positioning <br />the black mark on the gauge under the blade, be sure the <br />blade makes uniform contact with the gauge. <br />Blade Set line o <br />Gauge <br />Blade <br />Gauge <br />Tool Body <br />Blade <br />Holder <br />Blade Set Line Wide Side of Blade <br />Figure 1 <br />The bolts on the blade holder should now be tightened to <br />secure the blade. The tool is now prepared to remove the <br />gloss from the ends of the containment pipe. After removing <br />the gauge, insert the tool into the pipe to be machined until <br />the blade just touches the end of the pipe. Tool must be rota- <br />ted in a counter -clockwise direction. Advance the tool in <br />approximately 1/4" increments after each revolution and con- <br />tinue machining operation until the gloss has been removed <br />for a minimum length of 33/4". <br />
The URL can be used to link to this page
Your browser does not support the video tag.