Laserfiche WebLink
CITY OF LODI - Community Development Department, Building Inspection Division <br />* * * * * * FINAL INSPECT ON APPROVALS AND CERTIFICA Y E OF OCCUPANCY <br />------------------------------------------------------------------------------------------- <br />Permit No: B5791 Job Address: 880 VICTOR RD LODI <br />Subdivision: Lot: Apn: 49-050-32 <br />Property Owner: SINGH, SUKH C & PERMINDER K <br />Owner Address: 2849 WATT AVE SACRAMENTO CA, 95821 <br />Contractor: WALTON ENGINEERING INC Lic No: 617238 <br />Contractor Address: PO BOX 1025 WEST SACRAMENTO, CALIFORNIA 95691 <br />------------------------------------------------------------------------------------------- <br />Project Descri tion <br />Diesel fuel system installation. <br />------------------------------------------------------------------------------------------- <br />Total Sq. Ft.: Valuation: $ 10,000 Construction. Type: <br />No. Stories: 0 No. of Bdrm.: 0 Occupancy: U-2 <br />Zoning: 62 Type Project: COMMERCIAL Plan No: <br />------------------------------------------------------------------------------------------- <br />INSTRUCTIONS <br />Please Note: This form must be completed and returned to the Building Inspection Division BEFORE a <br />final inspection by the Building Division will be scheduled. Permitee is responsible for obtaining the <br />following approvals: <br />FIRE DEPARTMENT: 333-6739 <br />PUBLIC WORKS DEPT: 333-6706 <br />BUILDING INSPECTION: 333-6716 <br />1 19LIJ W OLN 0 D1# ITEM N 01 <br />113 112 Lexel'! ! <br />This Certificate is issued pursuant to the requirements of Section 109 of the Uniform Building Code; certifying that at the time of <br />issuance, this structure was in compliance with the various ordinances of the City of Lodi regulating building construction or use. <br />The Building Inspection Division shares your desire to complete the final inspection phase of your project in an expeditious manner. <br />However, prior to approval of final inspection, and authorization of gas service connections, the builder is responsible for contacting <br />the Departments listed above and obtaining final unconditional approval from the agency or City Department. <br />The Building Inspection Division will schedule a final inspection when the appropriate approval signatures have been secured and this <br />form has been returned to the Building Inspection Division. <br />------------------------------------------------------------------------------ <br />RETURN THIS FORM TO THE BUILDING INSPECTION DIVISION, WITH THE ABOVE NOTED <br />REQUIRED SIGNATURES, BEFORE A FINAL INSPECTION MAY BE SCHEDULED <br />