My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2300 - Underground Storage Tank Program
>
PR0231746
>
COMPLIANCE INFO_2000-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2023 3:59:11 PM
Creation date
6/23/2020 6:51:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000-2003
RECORD_ID
PR0231746
PE
2361
FACILITY_ID
FA0003862
FACILITY_NAME
Marks Fuel & Food, Inc.
STREET_NUMBER
880
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
049-050-32
CURRENT_STATUS
01
SITE_LOCATION
880 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231746_880 E VICTOR_2000-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br />.11 <br />Introduction................................................................. 2 <br />PART ONE: PRIMARY PRODUCTS PIPING -RED THREAD IIA <br />PIPE AND FITTINGS <br />SECTION 1 - Storage and Handling ............................4 <br />1.1.1 <br />Packaging, Ordering, and <br />SECTION I - Secondary Containment Piping <br />Shipping Information (Table 1. 1. 1) .....................4 <br />1.1.2 <br />Packaging ..............................................................4 <br />2.1.2 Secondary Containment Fittings .......................21 <br />1.1.3 <br />Storing .................................................................. <br />4 <br />1.1.4 <br />Transporting .........................................................4 <br />2.2.1 Piping Layout .....................................................22 <br />1.1.5 <br />Loading and Unloading .......................................4 <br />22 <br />SECTION 2 - Layout and Preparation .........................5 <br />1.2.1 <br />Inspection .............................................................5 <br />2.7.3 Bonding .............................................................. 28 <br />1.2.2 <br />Installation Crew Size and Organization .............5 <br />2.7.5 Precautions .........................................................28 <br />SECTION 3 - Tool and Equipment List .......................5 <br />2.7.6 Adhesive Cure .....................................................28 <br />1.3.1 <br />Recommended Equipment for Cool Weather <br />Secondary Containment Piping ................................29 <br />PipeAssembly .......................................................5 <br />2.9.1 Replacing Leaking Secondary <br />1.3.2 <br />Recommended Equipment for Installing <br />2.9.2 Repairing Minor Pipe Damage ...........................31 <br />2"-4" Pipe ..............................................................6 <br />2.9.3 Repairing Extensive Pipe Damage ......................31 <br />SECTION 4 -Joining Methods ....................................6 <br />1.4.1 <br />General Concepts .................................................6 <br />1.4.2 <br />Bell and Spigot joining Method ...........................7 <br />SECTION 5 - Cutting and Tapering ............................7 <br />1.5.1 <br />Cutting .................................................................. <br />7 <br />1.5.2 <br />Tapering ................................................................ <br />8 <br />SECTION 6 - Installation .............................................8 <br />1.6.1 <br />Piping Layout .......................................................8 <br />1.6.2 <br />Trenching and Backfilling ....................................8 <br />1.6.3 <br />Adhesive Bonding .................................................9 <br />1.6.4 <br />joint Assembly ....................................................11 <br />1.6.5 <br />Adhesive Cure Time ...........................................13 <br />1.6.6 <br />Connecting to Other Systems ............................16 <br />1.6.7 <br />Flexible Hose Connections .................................16 <br />1.6.8 <br />Inspecting for Potential Causes <br />of joint Failure ....................................................17 <br />SECTION 7 - Testing Recommendations ..................17 <br />1.7.1 <br />Safety Precautions ..............................................17 <br />1.7.2 <br />Test Procedures ...................................................18 <br />1.7.3 <br />Air Test Procedures and Safety Precaution ......... <br />18 <br />SECTION <br />8 - Repair Procedures ................................19 <br />1.8.1 <br />Repairing Weather Damage ................................19 <br />1.8.2 <br />Pipe Patching ......................................................19 <br />1.8.3 <br />Repairing Extensive Damage ..............................20 <br />1.8.4 <br />Leaking Joints.....................................................21 <br />PART TWO: SECONDARY CONTAINMENT PIPING -RED <br />THREAD IIA PIPE AND RED THREAD IIA SECONDARY CON- <br />TAINMENT FITTINGS <br />SECTION I - Secondary Containment Piping <br />System Components ..................................................21 <br />2.1.1 Secondary Containment Pipe ............................21 <br />2.1.2 Secondary Containment Fittings .......................21 <br />2.1.3 Adhesive for Secondary Containment Piping .... <br />21 <br />SECTION 2 - System Preparation ..............................22 <br />2.2.1 Piping Layout .....................................................22 <br />........26 <br />2.2.2 Pipe Preparation and Tool Set-up and Use ......... <br />22 <br />2.2.3 Pipe Assembly .....................................................23 <br />2.2.4 Fitting Assembly .................................................24 <br />2.7.3 Bonding .............................................................. 28 <br />RED THREAD 11A Pipe Sr Fittings <br />TABLE OF CONTENTS <br />SECTION 3 - Containment Crossover Detail ............ 24 <br />2.3.1 Preparation .........................................................24 <br />SECTION 4 - Termination Connections ...................25 <br />2.4.1 Termination at the Storage Tank .......................25 <br />2.4.2 Termination at the Dispenser ............................25 <br />2.4.3 Termination Fittings ...........................................26 <br />SECTION 5 - Secondary Containment System <br />....8 <br />Size Reductions ..........................................................26 <br />SECTION 6 - Secondary Containment Saddles <br />........26 <br />SECTION 7 - Adhesive Bonding and Curing ............ <br />27 <br />2.7.1 Introduction .......................................................27 <br />2.7.2 Cleaning the Bonding Surfaces ..........................27 <br />2.7.3 Bonding .............................................................. 28 <br />2.7.4 Assembling and Bolting .....................................28 <br />2.7.5 Precautions .........................................................28 <br />2.7.6 Adhesive Cure .....................................................28 <br />SECTION 8 - Testing Recommendations for <br />Secondary Containment Piping ................................29 <br />SECTION 9 - Repairs ..................................................30 <br />2.9.1 Replacing Leaking Secondary <br />Containment joints ............................................30 <br />2.9.2 Repairing Minor Pipe Damage ...........................31 <br />2.9.3 Repairing Extensive Pipe Damage ......................31 <br />PART THREE: TELESCOPING PIPE SYSTEM <br />SECTION I - RED THREAD IIA Secondary <br />Containment Telescoping Pipe System ....................31 <br />3.1.1 Telescoping System ............................................31 <br />3.1.2 Assembly .............................................................31 <br />3.1.3 Description .........................................................31 <br />3.1.4 Installation .........................................................31 <br />LIST OF TABLES <br />Table 1.1.1 Standard Packaging of Pipe .........................4 <br />Table 1.2.1 Suggested Units of Labor for <br />Installation..................................................5 <br />Table 1.3.1 Wattage Requirements for <br />Electric Heating Collars ...............................6 <br />Table 1.3.2 Extension Cord Length ...............................6 <br />Table 1.6.1 Recommended Minimum Burial Depths <br />....8 <br />Table 1.6.2 Adhesive Kit Data ......................................10 <br />Table 1.6.3 Adhesive Cure Times When Using <br />Electric Heating Collars .............................14 <br />Table 1.8.1 Make-up Dimensions (Wet) ......................20 <br />Table 2.2.1 Determining Length of <br />Containment Pipe .....................................23 <br />Table 2.3.1 Containment Crossover Information .......24 <br />Table 2.3.2 Pipe Separation Distances ..........................24 <br />Table 2.4.1 Termination Fitting Connections .............26 <br />Table 2.7.1 Number of Containment Fitting <br />Bonds per Adhesive Kit .............................28 <br />Table 3.1.1 Sizing for Telescoping Pipe Systems .......... 32 <br />Table 3.1.2 Determining Length of <br />Containment Pipe .....................................32 <br />M <br />
The URL can be used to link to this page
Your browser does not support the video tag.