My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2300 - Underground Storage Tank Program
>
PR0231746
>
COMPLIANCE INFO_2010-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:34:55 PM
Creation date
6/23/2020 6:51:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2011
RECORD_ID
PR0231746
PE
2361
FACILITY_ID
FA0003862
FACILITY_NAME
Marks Fuel & Food, Inc.
STREET_NUMBER
880
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
049-050-32
CURRENT_STATUS
01
SITE_LOCATION
880 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231746_880 E VICTOR_2010-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
339
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S W RCB,January 2002 <br /> Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: 0 Piping Manufacturer X Industry Standard ❑Professional Engineer <br /> 0 Other(Spec) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> 0 Other(Spec) <br /> Test Equipment Used: GAUGE Equipment Resolution: <br /> Piping Run#DSL Piping Run# P7Run# PipingRun# <br /> Piping Material: FIBERGLASS <br /> Piping Manufacturer: SMITH <br /> Piping Diameter: 3 <br /> Length of Piping Run: 75 <br /> Product Stored: DSL — <br /> Method and location of --2!2-in -run isolation: ISO BOOT <br /> Wait time between applying <br /> Pressure/vacuum/water and 5 <br /> starting test: <br /> Test Start Time: 2:05 <br /> Initial Reading(RO: 5 PSI <br /> Test End Time: 3:05 <br /> Final Reading(RF): 5 PSI <br /> Test Duration: 1 HOUR <br /> Change in Reading(RF-R{}: 0 <br /> Pass/Fai—Threshold or <br /> Criteria: 0 <br /> Test Result: X Pass 0 Fail ❑ Pass 0 Fail 0 Pass ❑Fail ❑ Pass ❑Fail <br /> COT melitS—(include information on repairs made prior to testing and recommem tedfollow-up far failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.