Laserfiche WebLink
SWRCB,January 2002 Y� (a,_' <br /> Page of <br /> 8. UNDER-DISPENSER CONTAINMENT WE C)TESTING <br /> Test Method Developed By: ❑UDC Manufacturer ❑Industry St-,mdard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum O Hydrostatic <br /> ❑Other(Spec) <br /> TeI <br /> t Equipment Used Equipment Resolution: <br /> UDC# UDC# UDC# UDC# <br /> Manufacturer: <br /> Material: <br /> Depth: <br /> Height from UDC Bottom to Top <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> testing: <br /> Portion of UDC Tested <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes D No [INA <br /> ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> product and water)?` <br /> Turbine shutdown response time <br /> Is system programmed for fail- <br /> safe shutdown?` ❑Yes 0 No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was fail-safe verified to be <br /> operational?* ❑Yes ❑No ❑NA ❑Yes ❑No DNA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test <br /> Test Start Time: <br /> Initial Reading(R,): <br /> Test End Time: <br /> Final Reading(RF): - <br /> Test Duration: <br /> Change in Readin (RF-R,): <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: G Pass ❑Fail ❑ Pass ❑bail ❑ Pass- <br /> 0 11 Pass ❑Fail <br /> Was sensor removed for testing? ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes 0 No [INA Q Yes ❑No ❑NA <br /> Was sensor properly replaced and <br /> verified functional after testing? ❑Yes ❑No ❑NA ❑Yes ❑No DNA D Yes ❑No [INA ❑Yes ❑No ❑NA <br /> Comments—(include information on repairs made prior to testing and recommence ollow-up for failed tests) <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answ(;r to M of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />