Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 7. UNDER-DISPENSER CONTAINMENT QTQ TESTING <br /> Test Method Developed By: ❑UDC Manufacturer X Industry St;tndard J Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: INCON TS-STS Equipment Resolution: 0 <br /> UDC# 3&4 UDC# UDC# UDC# <br /> ?LUJDC <br /> anufacturer: SMITH <br /> aterial: FIBERGLASSepth: 26 <br /> Height from UDC Bottom to Top <br /> of Highest PjpLng Penetration: 7 <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: 6 <br /> Condition of UDC prior to <br /> testing: FAIR <br /> Portion of UDCTested <br /> es turbine s11" <br /> Dohut down when <br /> UDC sensor detects liquid(both X Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes J No El NA <br /> -product and water)?' <br /> Turbine shutdown response tint- 5 <br /> Is system programmed for fail- <br /> safe shutdown?* X Yes ❑No ❑NA ❑Yes ❑No ❑NA J Yes ❑No ❑NA ❑Yes ❑No JNA <br /> Was fail-safe verified to be <br /> o -rational?' X Yes ©No J NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No JNA <br /> Wait time between applying <br /> pressure/vacuum/water and I5 <br /> startin test <br /> Test Start Tim-: 3:53 <br /> Initial Reading(Rt): 4.6381 <br /> Test End Time: 4.05 <br /> Final Reading RF): 4.6381 <br /> Test Duration: I HOUR <br /> ..Change in Reading(RF-Rt): .0000 <br /> Pass/Fail Threshold or Criteria: .002 <br /> Test Result: X Pass ❑Fait ❑ Pass J Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? XYes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and <br /> vfunctional after testin ? XYes Q No ❑NA <br /> erified ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Comments—(include information on repairs made prior to testing and recommenced follow-up for failed tests) <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answt;r to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />