My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2300 - Underground Storage Tank Program
>
PR0231746
>
COMPLIANCE INFO_2010-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:34:55 PM
Creation date
6/23/2020 6:51:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2011
RECORD_ID
PR0231746
PE
2361
FACILITY_ID
FA0003862
FACILITY_NAME
Marks Fuel & Food, Inc.
STREET_NUMBER
880
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
049-050-32
CURRENT_STATUS
01
SITE_LOCATION
880 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231746_880 E VICTOR_2010-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
339
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />SWRCB, January 2002 <br />Page of <br />5. SECONDARY PIPE TESTING <br />— <br />Test Method Developed By: <br />❑ Piping Manufacturer <br />X Industry Standard ❑ Professional Engineer <br />❑ Other (Specify} <br />Test Method Used: <br />X Pressure <br />0 Vacuum <br />❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Pressure Gauge <br />Equipment Resolution: 0 <br />Piping Run # 1 Piping Run # 2 <br />Piping Run # 3 Piping Run # <br />Piping Material: <br />F/G <br />F/G <br />F/G <br />Piping Manufacturer. <br />LINK <br />UNK <br />UNK <br />Piping Diameter: <br />3') <br />3„ <br />Length of Piping Run: <br />145' <br />150' <br />3 <br />Product Stored: <br />87 <br />91 <br />90' <br />Method and location of <br />DIESEL <br />piping -run isolation: <br />BOOT IN UDC BOOT IN SUMP <br />N SUMP <br />Wait time between applying <br />Pressure/vacuum/water and <br />0 <br />0 <br />startin test: <br />Test Start Time: <br />9:50 <br />9:30 <br />00 <br />R5PSI <br />Initial Reading (RI): <br />5 PSI <br />5 PSI <br />SI <br />Test End Time: <br />10:50 <br />10:30 <br />0 <br />Final Reading (RF): <br />5 PSI <br />5 PS1 <br />Test Duration: <br />I HR <br />IHR <br />IHR <br />Change in Reading (RF -R,): <br />0 <br />0 <br />Pass/ 'ail'Threshold or <br />0 <br />Criteria: <br />0 <br />0 <br />0 <br />Test Result: <br />X Pass ❑Pail X Pass <br />El Fail <br />X Pass ❑Fail ❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for ailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.