Laserfiche WebLink
11 <br />S WRCB, January 2002 <br />Page of <br />❑ Professional Engineer <br />X Hydrostatic <br />Tient Resolution: 0 <br />ifs <br /># 3 Sump # <br />3679 <br />Sump Material: <br />Height from Tank Top to Top of <br />Hi est Pi in Penetration: <br />W <br />❑ Yes ❑ No XNA <br />52" <br />FJ/G <br />12" <br />11" <br />DRY <br />1" ABOVE <br />PIPING <br />❑ Yes ❑ No XNA <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to testing: <br />Portion of Sump Tested' 1" ABO <br />Does turbine shut down when <br />sump sensor detects liquid (both ❑ Yes No NA <br />product and water)?' <br />D Yes ❑ No a NA <br />Turbine shutdown response time <br />N/A <br />N/A <br />❑ Yes ❑ No X NA <br />❑ Yes ❑ No X NA <br />0 <br />10:45 <br />3.7636 <br />NIA <br />❑ Yes ❑ No X NA <br />❑ Yes ❑ No X NA <br />0 <br />1:41 <br />5.7880 <br />is system programmed for fail-safe <br />shutdown?* Q Yes ❑ No X NA <br />Was fail-safe verified to be <br />operationaW ❑ Yes ❑ No X NA <br />Wait time between applying <br />pressure/vacuum/water and starting 0 <br />test: <br />Test Start Time: 10:45 <br />Initial Reading (Ri): 4.7970 <br />❑ Yes 0 N 0 N <br />❑ Yes ❑ No ❑ NA <br />Test End Time: <br />11:00 <br />11:00 <br />3.7632 <br />1:56 <br />5.7868 <br />Final Reading (RF): 4.7970 <br />Test Duration: <br />Change in Reading (RF-Rj): <br />15 MIN <br />0 <br />15 MIN <br />.0004 <br />.002 <br />X Pass ❑ Fail <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />15 MIN <br />.0012 <br />,002 <br />X Pass ❑ Fail <br />X Yes ❑ Na ❑ NA <br />X Yes Q No ❑ NA <br />Pas sl 'ail Threshold or Criteria: .002 <br />Test Result: X Pass ❑ Fail <br />Q Pass ❑ Fail <br />Was sensor removed for testing? X Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />verged functional after testin ? X Yes ❑ No ❑ NA <br />❑Yes ❑ No DNA <br />❑ Yes ❑ No ❑ NA <br />Goll meats — (include information on re airs made prior to testin ,and recommended follow-up or failed tests) <br />I If the entire depth of the sump is not tested, specify how much was tested. If the answer to an of the questions indicated with an <br />asterisk (*) is "No,, or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />