Laserfiche WebLink
v <br />SWRCB, January 2002 <br />Page of <br />7. UNDER -DISPENSER CONTAL MENT UDC TESTING <br />Test Method Developed By: ❑UDC Manufacturer X Industry Standard ❑ Professional Engineer <br />0 Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum <br />X Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: INCON TS STS <br />Equipment Resolution: 0 <br />UDC M J-io I <br />UDC- <br />Manufacturer: <br />UDC Material: <br />UDC Depth: <br />UNK <br />F/G <br />27" <br />- - - <br />v.r✓a. rt <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />6" <br />6" <br />Condition of UDC prior to <br />testing: <br />Portion of UDC Tested <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?` <br />-- <br />DRY <br />g== <br />❑ Yes ❑ No XNA <br />❑ Yes ❑ No NA <br />❑ Yes ❑No ❑NA <br />[]Yes El No ❑NA <br />Is system programmed for fail- <br />Turbine shutdown response timeFYes <br />safe shutdown?" <br />N/A <br />0 No X NA <br />❑ Yes ❑ No ❑NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Was fail-safe verified to be <br />operational?* <br />❑ No X NA <br />- <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Wait time between applying <br />Pressure/vacuum/water and <br />starting test <br />0 <br />Test Start Time: <br />1:01 <br />Initial Reading (R7): <br />Test End Time: <br />3.0780 <br />1:16 <br />Final Readin (RF): <br />3.0778 <br />Test Duration: <br />15 MIN <br />Change in Reading (RF -R,): <br />Pass/Fail Threshold or Criteria: <br />_0002 <br />.002 <br />Test Result: <br />Was sensor removed for testing? <br />Was sensor properly replaced and <br />verified functional after testin ? <br />X Pass ❑Fail <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No Cl NA <br />❑Pass ❑ Fail <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />11 Pass ❑Fail <br />11 Pass ©FaII <br />❑ Yes ❑ No [INA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Comments — (include in ormation on repairs made prior to testing, and recommended ollow-u for failed tests) <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to gBy of the questions indicated with an <br />asterisk(*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -I60) <br />