My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2300 - Underground Storage Tank Program
>
PR0231746
>
COMPLIANCE INFO_2010-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:34:55 PM
Creation date
6/23/2020 6:51:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2011
RECORD_ID
PR0231746
PE
2361
FACILITY_ID
FA0003862
FACILITY_NAME
Marks Fuel & Food, Inc.
STREET_NUMBER
880
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
049-050-32
CURRENT_STATUS
01
SITE_LOCATION
880 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231746_880 E VICTOR_2010-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
339
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />Ll <br />7. IINI}F.R_nTCPT.NfiT, T2 Cn3vTAirTMi�tarm �rrnr. m�rr. <br />Page of <br />Test Method Developed liy: <br />❑UDC Manufacturer X Industry Standard ❑ Professional Engineer <br />❑ Other (Spec fi) <br />Test Method Used: <br />❑ Pressure <br />❑ Vacuum <br />X Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: INCON TS STS <br />Equipment Resolution: 0 <br />UDC # 1-2 <br />UDC # 3-4 <br />UDC # 5-6 UDC # 7-8 <br />UDC Manufacturer: <br />UNK <br />UNK <br />UNK <br />UNK <br />UDC Material: <br />F/G <br />F/G <br />F/G <br />F/G <br />UDC Depth: <br />2T' <br />27" <br />27" <br />27„ <br />Height from UDC Bottom to Top <br />of Highest Pi in Penetration: <br />6„ <br />6" <br />6" <br />6" <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />6„ <br />6" <br />Condition of UDC prior to <br />testing: <br />DRY <br />DRY <br />DRY <br />DRY <br />Portion of UDC Tested <br />81, <br />81, <br />8" <br />g, <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />❑ Yes ❑ No XNA <br />❑ Yes ❑ No XNA <br />❑ Yes ❑ No XNA ❑ Yes <br />❑ No XNA !, <br />product and water)?* <br />Turbine shutdown response time <br />NIA <br />N/A <br />N/A <br />N/A <br />Is system programmed for fail- <br />safe shutdown?' <br />❑ Yes []No X NA <br />❑ Yes ❑ No XNA <br />❑ Yes ❑ No X NA ❑ Yes <br />❑ No XNA <br />Was fail-safe verified to be <br />operational?* <br />❑ Yes ❑ No X NA <br />❑ Yes ❑ No X NA <br />❑ Yes ❑ No X NA ❑ Yes <br />❑ No X NA <br />Wait time between applying <br />pressure/vacuum/water and <br />0 <br />0 <br />0 <br />0 <br />starting test <br />Test Start Time: <br />1:41 <br />1:41 <br />1:01 <br />1:01 <br />Initial Reading (RI): <br />3.0628 <br />3.9687 <br />3.9885 <br />4.8492 <br />Test End Time: <br />1:56 <br />1:56 <br />1:16 <br />1:16 <br />Final Reading (RF): <br />3.0628 <br />3.9687 <br />3.9883 <br />4.8491 <br />Test Duration: <br />15 MIN <br />15 MIN <br />15 MIN <br />15 MIN <br />Change in Reading (RF -U: <br />0 <br />0 <br />.0002 <br />.0001 <br />Pass/Fail Threshold or Criteria: <br />.002 <br />.002 <br />.002 <br />.002 <br />Test Result: <br />X Pass ❑ ]Fail <br />X Pass ❑ Fail <br />X Pass ❑ ]Fail X Pass ❑ Fail <br />Was sensor removed for testing? <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA X Yes <br />❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testin <br />X Yes []No ❑ NA <br />X Yes []No ❑ NA <br />X Yes ❑ No ❑ NA X Yes <br />❑ No ❑ NA <br />Comments — (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to aqU of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.