My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2300 - Underground Storage Tank Program
>
PR0231784
>
COMPLIANCE INFO_2007-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:43:47 PM
Creation date
6/23/2020 6:52:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2009
RECORD_ID
PR0231784
PE
2361
FACILITY_ID
FA0003834
FACILITY_NAME
PACIFIC AVE CHEVRON
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
097-410-48
CURRENT_STATUS
01
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231784_6633 PACIFIC_2007-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 3. <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: Tank Manufacturer ❑ Industry Standard El Professional Engineer <br /> El Other (Specify) <br /> Test Method Used: M Pressure F� Vacuum ❑ Hydrostatic <br /> Other (Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Run# 1 sup Piping Run# 2 reg Piping Run# 3 reg Piping Run# <br /> Piping Material: fiberglass fiberglass fibewrglass <br /> Piping Manufacturer: smith smith smith <br /> Piping Diameter: 311 311 311 <br /> Length of Piping Run: 2101 2101 2101 <br /> Product Stored: sup reg reg <br /> Method and location of sup reg reg <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min <br /> starting test: <br /> Test Start Time: 8:08 8:10 8:10 <br /> Initial Reading(RI ): 3 psi 3 psi 3 psi <br /> Test End Time: 9:08 9:10 9:10 <br /> Final Reading(RF ): 3 psi 3 psi 3 psi <br /> Test Duration: 1 hr 1 hr 1 hr <br /> Change in Reading(RF-RI ): 0 psi- 0 psi 0 p s i <br /> Pass/Fail Threshold or 0 psi 0 psi 0 psi <br /> Criteria: <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.