My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2300 - Underground Storage Tank Program
>
PR0231784
>
COMPLIANCE INFO_2007-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:43:47 PM
Creation date
6/23/2020 6:52:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2009
RECORD_ID
PR0231784
PE
2361
FACILITY_ID
FA0003834
FACILITY_NAME
PACIFIC AVE CHEVRON
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
097-410-48
CURRENT_STATUS
01
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231784_6633 PACIFIC_2007-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 9 isPage 4 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: F-1 Sump Manufacturer ❑ Industry Standard X❑ Professional Engineer <br /> ❑ Other (Specify) <br /> Test Method Used: ❑ Pressure ❑ Vacuum X❑ Hydrostatic <br /> ❑ Other (Spec) <br /> Test Equipment Used: vplt Equipment Resolution: <br /> Sump# 1 Sump# 2 Sump# 3 Sump# <br /> Sump Diameter: 4811 4811 4811 <br /> Sump Depth: 5711 5711 5711 <br /> Sump Material: FIBERGLASS fiberglass fiberglass <br /> Height from Tank Top to Top of 2011 20" 2011 <br /> Highest Piping Pentration: <br /> Height from Tank Top to Lowest 2011 20" 2011 <br /> Electrical Pentration: <br /> Condition of sump prior to testing: good good good <br /> Portion of Sump Tested: 1 2211 2211 2211 <br /> Does turbine shut down when <br /> sump sensor detects liquid(both X❑Yes❑No[]N EYes❑No[:]N Eyes ONo[]N ❑Yes[]No[:]N <br /> product and water)?* <br /> Turbine shutdown response time: 2-5 secs 2-5 secs 2-5 secs <br /> Is system programmed for fail-safe --'Yes <br /> ❑ � ❑ [:] � <br /> shutdown?* X Yes N N X Yes N N X Yes N N X Yes No <br /> Was fail-safe verified to be ❑ ❑ ❑ � ❑ ❑ <br /> operational?* X Yes N N X Yes N N X Yes N N X Yes No <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 min 5 min 5 min <br /> test: <br /> Test Start Time: 9:2 7 9:10 8:35 <br /> Initial Reading(Rl): 1.385 8.463 6.096 <br /> Test End Time: 9:57 9:40 9:05 <br /> Final Reading(RF): 1.167 8.417 6.077 <br /> Test Duration: 30 min 30 min 30 min <br /> Change in Reading(RF-Rl ): .017gph .017gph .001gph <br /> Pass/Fail Threshold or Criteria: .05gph .05gph .05gph <br /> SERENE= MEEMEMEM <br /> Was sensor removed for testing? R Yes N NA X Yes N NA X Yes N NA Yes No <br /> Was sensor properly replaced and ❑Ye N NA ❑Ye N X❑verifed functional after testing? � � YesF]N NA Yes❑N`�__N <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> starting and ending values are taken off t e vp t <br /> 1 If the entire depth of the sump is not tested,specify how much was tested.If the answer to my of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.