My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2300 - Underground Storage Tank Program
>
PR0231784
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:54:13 PM
Creation date
6/23/2020 6:52:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231784
PE
2361
FACILITY_ID
FA0003834
FACILITY_NAME
PACIFIC AVE CHEVRON
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
097-410-48
CURRENT_STATUS
01
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231784_6633 PACIFIC_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
604
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 9 <br />7. UNDER -DISPENSER CONTAINMENT (UDC) TESTING <br />Test Method Developed By: <br />❑ UDC Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: <br />❑ Pressure <br />❑ Other (Specify) <br />❑ Vacuum <br />® Hydrostatic <br />Test Equipment Used: See attached testing procedures. <br />Equipment Resolution: <br />UDC # 1-2 <br />UDC # 3-4 <br />UDC # 5-6 <br />UDC # 7-8 <br />UDC Manufacturer: <br />UDC Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />UDC Depth: <br />30" <br />30" <br />30" <br />30" <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />10" <br />10" <br />10" <br />10" <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />5" <br />5" <br />5" <br />5" <br />Condition of UDC prior to <br />testing: <br />Fair <br />Fair <br />Fair <br />Fair <br />Portion of UDC Tested <br />Above highest <br />penetration <br />Above highest <br />penetration <br />Above highest <br />penetration <br />Above highest <br />penetration <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?` <br />❑ Yes ❑ No ® NA <br />❑Yes ❑ No ® NA <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No ® NA <br />Turbine shutdown response time <br />n/a <br />n/a <br />n/a <br />n/a <br />Is system programmed for fail- <br />safe shutdown?* <br />❑ Yes ❑ No ® NA <br />❑Yes ❑ No ® NA <br />❑ Yes ❑ No ®NA <br />❑ Yes ❑ No ® NA <br />Was fail-safe verified to be <br />operational? <br />❑ Yes ❑ No ® NA <br />❑Yes ❑ No ® NA <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No ® NA <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />30 minutes <br />30 minutes <br />30 minutes <br />30 minutes <br />Test Start Time: <br />12:20pm <br />12:20pm <br />12:20pm <br />12:50pm <br />Initial Reading (Rj): <br />3.0000 <br />3.4313 <br />0.0780 <br />0.70000 <br />Test End Time: <br />12:35pm <br />12:35pm <br />12:35pm <br />1:05pm <br />Final Reading (RF): <br />3.9000 <br />3.4317 <br />0.0778 <br />1.0250 <br />Test Duration: <br />15 min <br />15 min <br />15 min <br />15 min <br />Change in Reading (RF-Ri): <br />-0.85223 <br />0.00035 <br />0.00026 <br />0.32907 <br />Pass/Fail Threshold or Criteria: <br />0.002 <br />0.002 <br />0.002 <br />0.002 <br />Test Result: <br />❑ Pass ® Fail <br />® Pass ❑ Fail <br />Z Pass'; ❑ Fail <br />❑ Pass ®Fail <br />Was sensor removed for testing? <br />®Yes [-]No ❑ NA <br />®Yes ❑No ❑NA <br />®Yes ❑No ❑ NA <br />®Yes ❑No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />®yes [:]No ❑ NA <br />®Yes [:]No ❑NA <br />®Yes ❑No ❑ NA <br />®Yes❑ No ❑ NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to M of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.