My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2300 - Underground Storage Tank Program
>
PR0231820
>
COMPLIANCE INFO_1986-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2020 9:36:47 AM
Creation date
6/23/2020 6:52:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2001
RECORD_ID
PR0231820
PE
2361
FACILITY_ID
FA0003826
FACILITY_NAME
Supervalu
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231820_1990 N PICCOLI_1986-2001.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
267
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WR=N MONTrORING PROCEDURES <br />UNDERGROUND STORAGE TANK MONITORING PROGRAIM <br />Tlus monitoring program must be kept at the UST lmdou at as soma. The Wbrmadon on this moniwrin, <br />program are conditions of tdc operating permit lie permit holder mast aodfY San Joaquin County <br />Environmental Health Division. Pyne (204) 46&340 a kWn 30 days of say changes W the moniwrmg <br />praeodures, unites regtured w obtain approval befto malting the Change. <br />• Required by Seasons 2632(d) an4 26ti(8) CCR - <br />Facility Name <br />e—"' <br />Facility Address <br />A. Describe the frequcmq of perfarmiag `the monitortW.� V TLS <br />Taste � � ��s-est CL <br />B. <br />C. <br />10 <br />F <br />G. <br />Pipin <br />Whrt methods and equipment, identified by name and model, will be used for <br />performing the monitoring: <br />Tank V� ���� TA,s 3 sc, N.. \ ��� 0 .z �,_ 1�. ,t./ k��. <br />A � �--� tom. � �•. �,....�� ��s� �- , d. �.��. ��.� �g <br />piping— <br />List, <br />ipin <br />Descritx the locatioa(s) where the monitoring wM be <br />should be attached): c <br />penormed (facility plot plan <br />List, the name(s) and title(s) of the people responsible for performing the monitoring <br />and/or mainta1mmg the equipment <br />format for monitoring: <br />Descnbe the preventive mamtewmce schedule for the monitoring equipm=t- Mote: <br />Ntaintenane , must be in accordance with the mannfhctarers, maintenance schedule <br />but sot less than every 12 months: <br />1—£ <br />Describe the training necessary for the operation of UST system. including piping, <br />and the\ monito e_quipmeat:-I-� s ,�. ;S �-� Tti.i ^=` ANIQ- <br />T�'z.�2 uc � CG,�e�.�.c'lL� �r •�-'a— ,r5� �lrt.� . !tiS — 0=,.v:r.,Q T�c.' � <br />.n . <br />
The URL can be used to link to this page
Your browser does not support the video tag.