Laserfiche WebLink
D. Results of Testing/Ser%dcing <br /> Software Version Installed: <br /> Complete the following checklist: <br /> 0 Yes C No" Is the audible alarm of ietionaf? <br /> 0 Yes 0 No- Is the visual alarm op,: dirinal? <br /> Yes ❑ No' Were aif sensors vista i'spected,functionally tested,and confirmed operafionat? <br /> Yes 0 NW Were ail sensors insta -d at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br /> Proper operation? <br /> Yes 0 No' If alarms are relayed ni i remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> 0 N/A <br /> Yes 0 NFor <br /> 0 N/A <br /> pressurized piping systems,does the turbine automatically shut down If the piping secondary containment monitoring system <br /> d tects a leak,fails to c eiYv <br /> r is electrically disconnected? if yes:which sensors initiate positive shut-down? (Check all that apply) <br /> SumplTrerxh Ser, Dispenser Containment Sensors. Did you confirm positive shut-down due to leaks and sensor <br /> weisconnection?r No. <br /> n Yes n No" For tank systems th r i -Ew the monitoring system as the primary tank overfill warning device(i.e.no mechanicai overfill prevention <br /> j� N/A valve is installed),ib the 3verfilf warning alarm visible and audible at the tank fill point(s)and operating property? If so,at what percent <br /> of tank ca it does I.i a arm tri ? % <br /> Yes` O No I Was any monitoring! ,a uipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the <br /> manufacturer name an., nodel for all replacement parts in Section E below. <br /> 0 Yes• No Was liquid found inside- ny secondary containmtent systems designed as dry systems? (Check all that apply)0 Product, 0 Water. if <br /> s,describe causes it ec tion E,below. <br /> Yes ❑ No' Was monitoring system A.up reviewed to ensure proper settings?Attach setup reports,if applicable <br /> Yes U NW Is all monitoring equipm. it aperational per manufacturer's specifications? <br /> "to Section E below,describe how and when tfiese deficiencies were or will be corrected. <br /> E. Comments= <br /> Monitoring System Certification Page 2 of 4 12/07 <br /> 2 2/21/47 <br /> z 'd 2iP69 T 9fr6Oa T s.1040eIu03 AI 84113 e9 T =LO IT 92 .add <br />