Laserfiche WebLink
F. In-Tank Gauging i SIR Equipme t: C Check this box if tank gauging is used only for inventory control. <br /> 'u Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank igi.lg equipment is used to perform leak detection monitoring. <br /> Ca_mplete the following ecklist <br /> Yes 0 No' Has all _ <br /> input+ ing been inspected for proper entry and termination,including testing for ground faults? <br /> 0 Yes r: No` Were all tank: egging probes visually inspected for damage and residue buildup? <br /> D Yes D No' Was accuraci if system product level readings tested? <br /> 0 Yes 0 No' Was accuracy it system water level readings tested? <br /> 0 Yes D No" Were all probe reinstalled properly? <br /> D. Yes Z No' Were all item:; in'he equipment manufacturer's maintenance checklist completed? <br /> *in the Section Fl;.below,describe hove nd when these deficiencies were or with be corrected. <br /> G. Line Leak Detectors(LLD): O Check this box if LLDs are not installed. <br /> Complete the followin checklist: <br /> m <br /> Yes D No' For equipment :tart-up or annual equipment certification,was a leak.simulated to verify LLD performance?(Check afl <br /> C N/A that appy) Sir .ilated leak rate Nd g.p.h.; 0 0.1 g.p.h; 0 0.2 g.p.h. <br /> Yes 0 No' Were all LLDs arr"irmed operational and accurate within regulatory requirements? <br /> Yes D .No' Was the test ir i apparatus properly calibrated?. <br /> Yes D No' For mechanic3 1.Ds,does the LLD restrict product flow.if it detects a leak?, <br /> :D N/A <br /> 0 Yes 0 No' For electronic l .Cs,does the turbine automatically shut off it the LLD detects a leak?. <br /> N/A <br /> C. Yes 0 No' For electronic: Ts, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> NIA disconnected' <br /> O Yes D No' For electronic I lis,does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> N/A fails a test? <br /> 0 Yes 0 No" For electronic l Da,have all accessible wiring connections been visually inspected? <br /> NIA. _ <br /> Yes o No. Were all items m the equipment manufacturer's maintenance checklist completed? <br /> a <br /> "in the Section H,below,describe how.3 d when these deficiencies were or will be corrected. <br /> H. Cornmenis: <br /> Monitoring System Certification ?age 3 of 4 Y2107 <br /> 3 2/21/07 <br /> 8 'd Zt►E9 T 91.602 T Sero-4ae4UO3 AI 84 T T 3 e9 T =L0 11 92 .add <br />