Laserfiche WebLink
0 0 <br />F. ® Gauging / SIR Equipment: U Check this box if tank gauging is used only for inventory control. <br />Ll Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />* Inthe Section H, below, describe how and went ese deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): LJ Check this box if LLDs are not installed. <br />Complete the following checklist: <br />7--. :7 -- <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />Was accuracy of system product level readin s tested? <br />Was accuracy of system water level readings tested? <br />Were all probes reinstalled pr <br />-Were all items- on the equipment manufacturer's maintenance checklist completed? <br />* Inthe Section H, below, describe how and went ese deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): LJ Check this box if LLDs are not installed. <br />Complete the following checklist: <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />ITIN rfl�. . <br />Page 3 of 3 03101 <br />For equipment start-up or annual equipment certification, was a leak simula ed to verify LLD performance? <br />(Check all that apply) Simulated leak rate-. Mxl3g.p.h.; LJO.lg.p.h; LJO,2g.p.h. <br />01MV0011001-11 <br />01 Irg <br />on W4 <br />o <br />1 <br />=10.1"Ally-I <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />ITIN rfl�. . <br />Page 3 of 3 03101 <br />