My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2300 - Underground Storage Tank Program
>
PR0231820
>
COMPLIANCE INFO_2009-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 2:39:37 PM
Creation date
6/23/2020 6:52:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2015
RECORD_ID
PR0231820
PE
2361
FACILITY_ID
FA0003826
FACILITY_NAME
Supervalu
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231820_1990 N PICCOLI_2009-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br />F. ® Gauging / SIR Equipment: U Check this box if tank gauging is used only for inventory control. <br />Ll Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />* Inthe Section H, below, describe how and went ese deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): LJ Check this box if LLDs are not installed. <br />Complete the following checklist: <br />7--. :7 -- <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />Was accuracy of system product level readin s tested? <br />Was accuracy of system water level readings tested? <br />Were all probes reinstalled pr <br />-Were all items- on the equipment manufacturer's maintenance checklist completed? <br />* Inthe Section H, below, describe how and went ese deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): LJ Check this box if LLDs are not installed. <br />Complete the following checklist: <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />ITIN rfl�. . <br />Page 3 of 3 03101 <br />For equipment start-up or annual equipment certification, was a leak simula ed to verify LLD performance? <br />(Check all that apply) Simulated leak rate-. Mxl3g.p.h.; LJO.lg.p.h; LJO,2g.p.h. <br />01MV0011001-11 <br />01 Irg <br />on W4 <br />o <br />1 <br />=10.1"Ally-I <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />ITIN rfl�. . <br />Page 3 of 3 03101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.