My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2300 - Underground Storage Tank Program
>
PR0231820
>
COMPLIANCE INFO_2009-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 2:39:37 PM
Creation date
6/23/2020 6:52:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2015
RECORD_ID
PR0231820
PE
2361
FACILITY_ID
FA0003826
FACILITY_NAME
Supervalu
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231820_1990 N PICCOLI_2009-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t- <br />Page of <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: X Piping Manufacturer Industry Standard Professional Engineer <br />Other (Spec) <br />Test Method Uses: X Pressure Vacuum Hydrostatic <br />Other (Sped) <br />Measuring Equipment Used for Testing: Liquid <br />Piping Run # 1 <br />Piping Material: Fiberglass <br />Filled Gauge 1% Dial Span Accuracy <br />Piping Run # 2 <br />Fiberglass <br />Piping Run # <br />Piping Manufacturer: Ameron <br />Ameron <br />Piping Diameter: 3" <br />4" <br />Length of Piping Run: 50' <br />20' <br />Product Stored: Diesel <br />Diesel <br />Method and location of Ameron Isolation Boot <br />piping -run isolation: <br />Ameron Isolation Boot <br />Wait time between applying <br />pressure/vacuum/water and 15 Min. <br />starting test: <br />15 Min. <br />Test Start Time: 10:15 <br />10:15 <br />Initial Reading (RI): 5 P.S.I. <br />5 P.S.I. <br />Test End Time: 11:15 <br />11:15 <br />Final Reading (RF): 5 P.S.I. <br />5 P.S.I. <br />Test Duration: 1 Hour <br />1 Hour <br />Change in Reading (RF -R,): 0 <br />0 <br />Pass/Fail Threshold: 0 <br />0 <br />Test Result: Pass <br />Pass <br />Comments — (include information on repairs made to facilitate a passing test and indicate whether a <br />permit was obtained for the repairs) <br />Note: Pressure testing of piping secondary containment systems should be performed at 5 PSI, <br />which is generally consistent with testing performed at time of installation. <br />R.C.U.S.T.COM <br />December 2001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.