My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2300 - Underground Storage Tank Program
>
PR0231820
>
COMPLIANCE INFO_2009-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 2:39:37 PM
Creation date
6/23/2020 6:52:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2015
RECORD_ID
PR0231820
PE
2361
FACILITY_ID
FA0003826
FACILITY_NAME
Supervalu
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231820_1990 N PICCOLI_2009-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page of -I <br />6. SUBMERSIBLE PUMP CONTAINMENT SUMP TESTING <br />Test Method Developed By: Sump Manufacturer X Industry Standard Professional Engineer <br />Other (Spec) <br />Test Method Uses: Pressure Vacuum X Hydrostatic <br />Other (Specify) <br />Measuring Equipment Used for Testing: INCON TS -STS V2.1 <br />Sump # S STP Sump # N STP Sump # <br />Sump Diameter: <br />36" <br />36" <br />Sump Depth: <br />5'-0" <br />5'-0" <br />Sump Material: <br />Fiberglass <br />Fiberglass <br />Height from Tank Top to Highest <br />Piping Penetration: <br />14" <br />14" <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />20" <br />24" <br />Condition of sump prior to testing: <br />Dry <br />Dry <br />Portion of Sump Tested. <br />2" Past Highest piping <br />2" Past Highest piping <br />penetration <br />penetration <br />Does turbine shut down when <br />sump sensor detects either product <br />Yes <br />Yes <br />or water? <br />Turbine shutdown response time. <br />4 Sec <br />4 Sec <br />Is system programmed for fail-safe <br />Yes <br />Yes <br />shutdown? <br />Was fail-safe verified to be <br />operational? <br />Yes <br />Yes <br />Wait time between applying <br />pressure/vacuum/water and starting <br />15 Min. <br />15 Min. <br />test: <br />Test Start Time: <br />10:27 / 11:18 <br />10:27 / 11:00 <br />Initial Reading (RI): <br />6.846 / 4.677 <br />5.009 / 5.008 <br />Test End Time: <br />10:42 / 11:33 <br />10;42 / 11:15 <br />Final Reading (RF): <br />6.845/ 4.677 <br />5.008 / 5.008 <br />Test Duration: <br />15 Min. <br />15 Min. <br />Change in Reading (RF -RI): <br />.001/.000 <br />.001/.000 <br />Pass/Fail Threshold: <br />.002 <br />.002 <br />Test Result: <br />Pass <br />Pass <br />Was sensor removed for testing? <br />Yes <br />Yes <br />Was sensor properly replaced after <br />testing? <br />Yes <br />Yes <br />Comments — (include information on repairs made to facilitate a passing test and indicate whether a <br />permit was obtained for the repairs) <br />All hydrostatic test performed twice to insure testing results <br />Note: Hydrostatic testing of sumps should, at a minimum, provide for a liquid level that tests the <br />tank/saddle juncture and the highest tank piping system projection into the sump. <br />R.C.U.S.T.COM December 2001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.