My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2300 - Underground Storage Tank Program
>
PR0231820
>
COMPLIANCE INFO_2009-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 2:39:37 PM
Creation date
6/23/2020 6:52:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2015
RECORD_ID
PR0231820
PE
2361
FACILITY_ID
FA0003826
FACILITY_NAME
Supervalu
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231820_1990 N PICCOLI_2009-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of <br />,I � 0 0 <br />.teff Won -,w.[ <br />To: asa cosby <br />Subject: RE: <br />From: Jeff_Wong_[EH] <br />To: aJenvirs@msn com <br />Cc: Patrick _Gu.illermety , Kasey F®ley _[EH] , Willy_Ng_[E_H] ; Raymond_ von Flue _jEH] <br />Sent: Friday, February 13, 2009 9:54 AM <br />Subject: RE: <br />Asa: <br />Corrosion protection is required in Title 23 CCR as follows: <br />1. Secondary containment system, Section 2632(4) <br />2. Outer surface of the tank if it's constructed of steel, 2635(2)(x) <br />3. Spill Container, Section 2635(b)(1)(a) <br />Your choice of 10 mil tape as we had discussed on the phone yesterday is adequate. The important <br />thing is to cover any metallic section on the riser and the new spill container exposed to the backfill (soil, <br />pea gravel, etc.). <br />Please contact Ray Von Flue at 1(209) 468-9848 to arrange a specific time on the 17th (the day you are <br />breaking out the concrete) to verfiy corrosion protection, or preferrably, fax a proposed schedule to our <br />office at 209-468-3433. Our office recommends adequate curing time for cement/concrete before doing <br />any work (i.e. overnight for Portland cement), such as the spill bucket test. <br />I will still be available to observe the spill bucket test any time on the following day (the 18th). My cell <br />number is 209-481-9100. You can could me any time this weekend. If I don't hear from you I will just <br />show up at around Ilam on the 18th as you had proposed. <br />Please refer to LG 166 Guideline for spill bucket testing procedures. <br />Please have the equipment that could demonstrate the new spill container holds a minimum of five <br />gallons after installation, as required under CCR Section 2635(b)(1)(B). (i.e. that equipment may be <br />a 5 -gallon, or larger size, bucket) <br />Regards, <br />Jeff <br />From: ajenviro@msn.com [mailto:ajenviro@msn.com] <br />Sent: Thursday, February 12, 2009 7:24 PM <br />To: Jeff Wong [EH] <br />Cc: Patrick Guillermety <br />Subject: Re: <br />Jeff, <br />I will be breaking out the spill bucket, and re -installing the new bucket on the 17th., I do not believe that you have <br />to be present to witness the excavation of the old spill bucket, and installation of the new one, however I will leave <br />the excavation open for you to witness the corrosion protection of the Riser pipe and or the new bucket, you can <br />✓19/2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.