My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2300 - Underground Storage Tank Program
>
PR0231820
>
COMPLIANCE INFO_2009-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 2:39:37 PM
Creation date
6/23/2020 6:52:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2015
RECORD_ID
PR0231820
PE
2361
FACILITY_ID
FA0003826
FACILITY_NAME
Supervalu
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231820_1990 N PICCOLI_2009-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Unified Grocers, Inc., <br />',0'Road Stockton CA <br />5. Contact Jeffrey Wong (468-0335) to arrange the following inspections (a minimum <br />48 hour notice in advance is required): <br />a. One hour hydrostatic test (or equivalent) on the new spill buckets. <br />b. Verify 5 gallon capacity. <br />c. The test fluid should cover the top joint, and be no less than 1.5 inches below the top <br />of the spill bucket, regardless of the spill bucket's capacity for the. <br />d. Test operation of the drain valve of the spill buckets. <br />6. A tank integrity test, by a third party certified tank tester, a secondary containment test <br />or a tank test performed by the Veeder Root TLS 350 (at a rate of 0.1 gallons per hour) <br />must be performed once concrete is poured in accordance with the manufacturer's <br />guidelines. Results must be received by the EHD within seven days of returning the <br />facility to operating condition. If concrete is broken over any piping the above- <br />mentioned testing is also required on that piping. <br />7. A "Certificate of Compliance for Underground Storage Tank Installation Form C" for the <br />diesel tank shall be submitted by the owner or the owners' agent [pursuant to (CCR) <br />2635(d)] within 30 days after work is completed, before this repair is considered <br />complete by the EHD. <br />9. Any changes in information and scope of work must be submitted to EHD for approval <br />prior to commencing work. All new addenda supersede the previous ones. <br />Contact Jeffrey Wong with any questions at (209) 468-0335. <br />Regards, <br />f � <br />Jeffrey Wong, REHS <br />Senior Registered Environmental Health Specialist <br />
The URL can be used to link to this page
Your browser does not support the video tag.