Laserfiche WebLink
11 <br />D. Results of Testing/Servicing <br />Software Version Installed: 127.04 <br />Complete the following checklist: <br />Q Yes <br />❑ No* <br />Is the audible alarm operational? <br />0 Yes <br />❑ No* <br />Is the visual alarm operational? <br />0 Yes <br />❑ No* <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />❑X Yes <br />❑ No* <br />Were all sensors instal led at lowest point of secondary containment and positioned so that other equipment <br />will not interfere with their <br />ro er o eration'? <br />❑ Yes <br />❑ No* <br />MOMMIMMEMMMM <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br />❑X N/A <br />operational? <br />❑X Yes <br />❑ No* <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary <br />❑ N/A <br />containment monitoring system detects a leak, fails to operate, or is electrically disconnected? Ifyes: which <br />sensors initiate positive shut -down? (Check all that apply) <br />0 Sump/Trench Sensors; ❑X Dispenser Containment Sensors. Did you confirm positive shut -down <br />due to leaks and sensor failure/disconnection? <br />Q Yes; El No. <br />❑ Yes <br />❑ No* <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br />❑X N/A <br />mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the <br />tank fill point(s) and operating properly? If so, at what percent of tank capacity does the alarm trigger? <br />=MYes <br />FV_1 No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment <br />replaced and list the manufacturer name and model for all replacement parts in Section E, below. <br />Yes* <br />® No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that <br />apply) ❑ Product; ❑ Water. If yes, describe causes in Section E, below. <br />QYes <br />❑ No* IlWas <br />monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br />QYes <br />❑ No* <br />Is all monitoring equipment operational per manufacturer's specifications? <br />* In Section E below, describe how and when these deficiencies were orwill be corrected. <br />E. Comments: <br />Other sensors from page one: <br />L3: Stp sump 794380-205 Certified. <br />Drop tube has over fill valve installed. <br />