My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
907
>
2300 - Underground Storage Tank Program
>
PR0231871
>
COMPLIANCE INFO_1998-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 3:51:51 PM
Creation date
6/23/2020 6:53:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2008
RECORD_ID
PR0231871
PE
2361
FACILITY_ID
FA0003968
FACILITY_NAME
AT&T California - UE046
STREET_NUMBER
907
Direction
W
STREET_NAME
LINCOLN
STREET_TYPE
Rd
City
Stockton
Zip
95207
APN
077-470-07
CURRENT_STATUS
01
SITE_LOCATION
907 W Lincoln Rd
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231871_907 W LINCOLN_1998-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
354
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page_of_ <br /> 5. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑ Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: INCON TS-STS TEST UNIT Equipment Resolution: .0006 <br /> Sump#PIPING Sump# Sump# Sump# <br /> 1171 <br /> Sump Diameter: 42" <br /> Sump Depth: 56" <br /> Sump Material: FIBERGLASS <br /> Height from Tank Top to Top of 20" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 15" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: GOOD <br /> Portion of Sump Tested' 2 INCHES ABOVE <br /> PIPING <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes ❑No ®NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> product and water)?* <br /> Turbine shutdown response time N/A N/A N/A N/A <br /> Is system programmed for fail-safe ❑Yes ❑No ®NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> shutdown?* <br /> Was fail-safe verified to be ❑Yes ❑No Z NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15 MIN. <br /> test: <br /> Test Start Time: 12:43 1:01 <br /> Initial Reading(Ri): 1.3177' 1.3177' <br /> Test End Time: 12:58 1:16 <br /> Final Reading(RF): 1.3176" 1.3176" <br /> Test Duration: 15 MIN 15 MIN <br /> Change in Reading(RF-Rj): .0001" .0001: <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 <br /> Test Result: ® Pass ❑Fail ❑ Pass ❑!Fail ❑ Pass p Fail ❑ Pass p Fail <br /> Was sensor removed for testing? ®Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and N Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testin ? <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.